Doc Date
6/18/2014
Doc Name
Weekly CQA Report- Weeks ending 05/31/14 and 6/7/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amelt, f <br /> transported to the buttress fill area upslope of stations J12+00 to J14+00 and downslope of <br /> stations J16+00 to J20+00 where it was placed as structural fill by Cat dozers. <br /> A Cat 330 excavator loaded tandem trucks with stockpiled material from various locations <br /> throughout the PSSA floor. The material was hauled to the northern half of the PSSA floor and <br /> placed as structural fill. <br /> A Cat dozer pushed material down from Dump 4 to stations M28+00 to M30+00 where it was <br /> placed as structural fill. <br /> A Cat GPS dozer performed rough grade subgrade preparation in the Phase 1 area above <br /> Bench A between approximate stationing A6+00 to A7+00. <br /> A Cat hammer-hoe broke oversized material in the subgrade downslope of stations A6+00. <br /> A Cat 320 hammer-hoe broke oversize materials and cut the ADR 'h : 1 slope at the 9,450 bench <br /> for additional bench access. Excess material was removed stockpiled at the south end of the'/: <br /> 1 slope for later removal. <br /> Subgrade slope finishing and contouring occurred at various locations below elevation 9,450 on <br /> the PSSA slopes. Excess cut was stockpiled at the toe of the slope for later removal. <br /> A Cat smooth drum roller compacted subgrade in various areas within PSSA and surrounding <br /> Phase 1 slopes. <br /> The following subgrade areas in the PSSA were compacted to finished grade, inspected and <br /> certified for soil liner fill (SLF)placement: <br /> The ADR platform <br /> From the A Bench (9,450 elevation)to the PSSA floor between approximate stations <br /> AO+00 to A4+00 <br /> The closure drain area <br /> See the attached subgrade acceptance map for all accepted subgrade locations. <br /> Concrete was poured after concrete forms and reinforced steel were constructed for the collars at <br /> the closure drain area. Soil liner fill was then placed and compacted with a plate tamper and <br /> smooth drum roller. The protective steel casings from around the PVC piping were cut off flush at <br /> the concrete collars. AMEC observed the placement of bottom layer of 12 oz. non-woven <br /> geotextile, the placement of the schedule 80 PVC 2-inch-diameter well screen(slot size 0.020), <br /> and leak detection fill over the schedule 80 piping within the closure drain floor after the soil liner <br /> fill was inspected and certified. Approximately 1,558 cubic yards of underdrain fill were hauled in <br /> and placed on the geotextile and leak detection fill in the closure drain area. <br /> Soil liner fill was inspected and certified in the closure drain area, specifically the one foot thick <br /> SLF layer below the actual closure drain. Note: there will be another SLF acceptance for the 3 <br /> foot layer above the closure drain as well. See the attached SLF acceptance map for all <br /> accepted locations. <br /> Soil liner fill from the Squaw Gulch stockpile was hauled to the southern PSSA floor and western <br /> inboard slopes. The material was placed on the approved slope subgrade and placed as fill and <br /> also stockpiled on the PSSA floor for later use in the area. <br /> Soil liner fill was placed in a loose lift approximately 1.5 feet thick on the approved subgrade by <br /> Cat GPS dozers and 740 Haul Trucks. <br /> SLF fininishing and contouring occurred on the SLF at the western PSSA slopes below stations <br /> A2+00 to A4+00. <br /> 2014.06.07-m1e2 weekly final Page 2 of 7 <br />