Laserfiche WebLink
ENGINEERING DESIGN BASIS American Shale Oil LLC <br /> SD Concrete Foundation Permit, Project Descriptions <br /> Page 3 of 4 Date: 5/29/14 2014-05-AP001-RFS Rev: 0 <br /> On concrete foundation B, an approximately 15 ft by 5 ft by 7 ft high 75 HP compressor will be <br /> installed next to a 5 ft by 5 ft by 10 ft high air cooler. Both units will sit on a 20 ft by 20 ft by 8 <br /> inches deep concrete foundation. Refer to G13042-1-2001 for the concrete foundation details. <br /> C. CCR Experimental Apparatus <br /> 1 <br /> On foundation C, a custom experimental apparatus called the CCR will be installed. The CCR is <br /> designed to test heat transfer through a pseudo retort. The concrete pad will be 16 ft by 14 ft by <br /> 8 inches deep. Equipment on this pad will include an electric reboiler (16 inch OD, 72 inch <br /> length), the primary CCR test vessel (36 inch OD, 6 ft tan-to-tan height), and a support structure <br /> (12 ft by 12 ft by 11 ft tall elevated platform with grated floor). Refer to G14040-01-2000 for <br /> design details. <br /> American Shale Oil, LLC <br />