My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-10_REVISION - P2008046 (3)
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2008046
>
2014-06-10_REVISION - P2008046 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:31:17 AM
Creation date
6/10/2014 12:14:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
Revision
Doc Date
6/10/2014
Doc Name
Modification Submittal
From
American Shale Oil, LLC
To
DRMS
Type & Sequence
MD9
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING DESIGN BASIS American Shale Oil LLC <br /> S� Concrete Foundation Permit, Project Descriptions <br /> Page 4 of 4 Date: 5/29/14 2014-05-AP001-RFS Rev: 0 <br /> D. Cryogenic Nitrogen Tank, Vaporizers and Auxiliary Equipment <br /> VOL; ZE <br /> Figure 3. Cryogenic Nitrogen Tank Installation. Note this is not the specific package that will be <br /> installed, however it will be very similar. <br /> Finally on concrete foundation D, a cryogenic nitrogen tank, ambient vaporizers, and auxiliary <br /> equipment will be installed on two 18 ft by 18 ft concrete foundations. One foundation will be 22 <br /> inches thick and will support the nitrogen tank. The other foundation will be 8 inches thick and <br /> will support the ambient vaporizers and other auxiliary equipment. Refer to drawings G13042-1- <br /> 2003 through 2005 for details. <br /> American Shale Oil, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.