Laserfiche WebLink
ENGINEERING DESIGN BASIS American Shale Oil LLC <br /> S� Concrete Foundation Permit, Project Descriptions <br /> Page 4 of 4 Date: 5/29/14 2014-05-AP001-RFS Rev: 0 <br /> D. Cryogenic Nitrogen Tank, Vaporizers and Auxiliary Equipment <br /> VOL; ZE <br /> Figure 3. Cryogenic Nitrogen Tank Installation. Note this is not the specific package that will be <br /> installed, however it will be very similar. <br /> Finally on concrete foundation D, a cryogenic nitrogen tank, ambient vaporizers, and auxiliary <br /> equipment will be installed on two 18 ft by 18 ft concrete foundations. One foundation will be 22 <br /> inches thick and will support the nitrogen tank. The other foundation will be 8 inches thick and <br /> will support the ambient vaporizers and other auxiliary equipment. Refer to drawings G13042-1- <br /> 2003 through 2005 for details. <br /> American Shale Oil, LLC <br />