Laserfiche WebLink
ENGINEERING DESIGN BASIS American Shale Oil LLC <br /> *so Concrete Foundation Permit, Project Descriptions <br /> Page 2 of 4 FDate75/29/14 2014-05-AP001-RFS Rev: 0 <br /> 3. Concrete Foundation and Equipment Details <br /> A. Propane Heater <br /> I J, <br /> ,'INSULATED <br /> STACK- <br /> MAXON KINEMA% <br /> GAS FIRED BURNER <br /> �w <br /> 1'RW <br /> FUEL GAS <br /> 1 <br /> VENT LDS <br /> I ur RvT <br /> FUEL GAS ''F <br /> ueEr- f <br /> CONTROL i W 12 K 19 <br /> PANEL _ \ STRUCTURAL <br /> SKID <br /> Figure 1. Propane Furnace <br /> On concrete foundation A is a 1,000,000 Btu/hr propane fired furnace designed to heat carbon <br /> dioxide. The unit is approximately 6 ft by 6 ft by 12 ft high. The unit will be placed on an 8 ft by 8 <br /> ft by 6 inches deep concrete foundation. Refer to drawing G13042-1-2002 for foundation details <br /> B. Compressor and Air Cooler <br /> a <br /> i - a <br /> I <br /> X-J <br /> Figure 2. Left, 75 HP Compressor. Right, Air Cooler. <br /> American Shale Oil, LLC <br />