SF-73-R-April 8 <br /> SF-74-R-April 10 <br /> SF-75-R-April 10 <br /> SF-76-R-April 10 <br /> SF-77-R-April 10 <br /> SF-78-R-April 10 <br /> SF-79-R-April 10 <br /> May 28 correspondence: <br /> 1) The SGVLF weekly report for the week ending 5/3/2014 listed DCF sample number 76, the <br /> week ending 5/10/14 also listed#76. Please explain the overlap in DCF sample numbers? <br /> Sample DCF-75 was completed on May 1 and should have been on the week ending 5/3 report and has <br /> now been added (attached), DCF-76 was reported on May 10 weekly. <br /> 2) The SGVLF weekly report for the week ending 5/10/2014 listed TS sample numbers 59—61 <br /> (noted as "clay from WHEX"). There have been no "TS" samples reported since at least <br /> before 8/17/13. Please explain the type of material designated as TS and summarize when <br /> samples TS-01 through TS-58 were taken. <br /> "TS" stands for Test Sample. These samples were taken for CC&V to assist with determining where <br /> acceptable Soil Liner Fill sources are located for use in the VLF. These samples will not be reported in <br /> the Record of Construction report as they are only an investigation/exploration tests for Soil Liner Fill <br /> material(s). When a potential borrow source is discovered, testing is performed to see if it meets or has <br /> potential after screening to meet the specifications. If it does,then the material will be sampled from <br /> the stockpiles after screening as a control sample,then after placement in its final location will be tested <br /> as a record sample. Testing of this material is sometimes intermittent depending on the size of the <br /> source(s)found. <br /> CC&V has historically provided our weekly construction activity progress reports to DRMS to <br /> provide context around ongoing construction activity. It is important to note that the purpose of <br /> these in-house reports is to document work in progress for the CC&V management team. They <br /> are not intended as a complete weekly Record of Construction documents. The final certification <br /> report will contain complete information that has been fully vetted for the SGVLF construction. <br /> While, we welcome any questions you may have regarding these reports, we wanted to clarify <br /> the intent of the reports, so you understand why there may be gaps in the information at times. <br /> Please let me know if you have additional questions. <br /> Sincerely, <br /> Timm Comer <br /> Manager, Environmental Resources <br /> Cc. Ron Roberts—Project Management Consultant and Scott Redabaugh—Construction <br /> Superintendent <br />