My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-06_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-06-06_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 12:16:00 AM
Creation date
6/9/2014 7:05:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
6/6/2014
Doc Name
Response- Weekly CQA Reports for 5/3/2014 & 5/10/2014
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All <br /> amec <br /> CRIPPLE CREEK& VICTOR GOLD MINING Co. <br /> Squaw Gulch (VLF),HWY 67 Realignment Field Monitoring Summary Weekly Report <br /> Owner: Cripple Creek& Victor Gold Mining Co. Project Number: Date <br /> Project: Squaw Gulch (VLF), Hwy 67 Re-alignment 74201125N0. ****. **** 12 April 2014 <br /> Location: Cripple Creek& Victor Gold Mine, Colorado Revised <br /> Contractor: Ames Construction Co. Inc. <br /> Reporting Period: 4.06.14 through 4.12.14 <br /> Days S M I T I W I T F S <br /> Work Shifts - D D D D D D <br /> D=Day Shift N=Night Shift W=Weather Day <br /> Ambient Temperature Ranges for reporting period: Weather conditions for reporting period: <br /> High: 36°F to 58°F Cloud Cover: Partly cloudy to overcast. <br /> Low: 34°F to 27°F Precipitation: Snow April 7,2014 <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the VLF. <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES and PROGRESS: <br /> 1) Earthworks <br /> A) VLF(PSSA, Phase I, Phase II) <br /> Topsoil I Overburden Stripping: No topsoil stripping occurred. <br /> Production drilling: Production drilling occurred within the VLF limits. <br /> Production blasting: Four(4)production blasts occurred within the VLF. <br /> Structural Fill: <br /> A Cat 992 loader removed material from down slope of stations 68+00 to B10+00 and ADR Haul Road stations <br /> 5+00 to 10+00. The material was hauled in Cat 777 haul trucks to the ADR haul road fill near stations 51+00 to <br /> 54+00 and the buttress fill down slope from stations J6+00 to J10+00 and J12+00 to J14+00 and was placed as <br /> structural fill by Cat dozers. The structural fill was placed and compacted per project specifications. <br /> A Cat 320 excavator and a Cat 330 hammer worked on cutting the%2:1 slope to grade while a Cat dozer stockpiled <br /> the cut material for removal. A John Deere 870 excavator removed the material from the'/2:1 slope between station <br /> AO+00 and the Highway 67 tie-in on the Cripple Creek side. The material was transported using Cat 740 haul <br /> trucks for placement as structural fill in the buttress fill down slope of stations J6+00 to J14+00,the Midway fill <br /> upslope of stations HO+00 to H2+00, and at the PSSA embankment fill. The structural fill was placed and <br /> compacted per method specifications. Select loads were also transported to the riprap pre-screen stockpile for <br /> processing. <br /> Page 1 of 7 MLE2 WE 12 April 2014.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.