My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-03_PERMIT FILE - P2014009 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2014009
>
2014-06-03_PERMIT FILE - P2014009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:30 PM
Creation date
6/6/2014 8:16:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014009
IBM Index Class Name
PERMIT FILE
Doc Date
6/3/2014
Doc Name
New NOI Form 2
From
New West Reclamation, LLC
To
DRMS
Email Name
DMC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
barrier. The concept is to prevent rain drop splash and control runoff.) Secure <br />with landscape staples per the manufacture's recommendations (Figs. #I and 2). <br />8) Hand sampled sites, given the small area of disturbance, Figure 3, will not have <br />burlap or other suitable material installed. The replaced waste rock material will <br />be compacted. The backfilled hand sampled hole will likely result in a slight <br />depression which will retain some runoff. Therefore, no other erosion controls <br />are planned for hand sampled sites. <br />(The exception to concurrent sample site reclamation will be sampling completed during <br />winter or snowfall months. During the winter sampling, we will complete what <br />backfilling and other sample site reclamation is logical to complete, given site specific <br />conditions. The winter sampled sites will be checked in the spring, after snow melt, for <br />implementation of any corrective actions necessary to stabilize the site.) <br />Inspection of each sample site location shall be performed by the Operator's local <br />representative, as required by applicable regulations. <br />3.1 Inspections: <br />3.1.1 The Operator's local representative shall inspect the waste dump upon <br />completion of sampling and sample site's reclamation for a waste dump. <br />The Operator's local representative shall ensure the sampled sites have <br />been stabilized according to the Stormwater Management Plan's <br />provisions. The Operator's local representative shall observe, record, <br />photo document the stabilization at each site. <br />3.1.2 Monthly inspections during the snow free period shall be performed to: <br />• Determine the effectiveness of the stabilization method and if the <br />Stormwater Management Plan needs revised. <br />• Determine if stabilization maintenance is needed at a site. <br />• Record in the Stormwater Management Log observations by site. <br />• Provide the Operator a monthly report of observations, needed <br />maintenance or recommended Stormwater Management Plan <br />revisions. <br />3.1.3 Semi - annual inspections shall be performed by the Operator's local <br />representative at the following times: <br />• A fall inspection shall be performed prior to snow fall to ensure all <br />sampled sites have had the Stormwater Management Plan <br />stabilization provisions applied. <br />• A spring inspection (Once snow melt and associated runoff has <br />occurred.) shall be performed to ensure all sampled site's <br />Stormwater Management Plan site stabilization provisions are in <br />place and performing as planned. <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.