My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-03_PERMIT FILE - P2014009 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2014009
>
2014-06-03_PERMIT FILE - P2014009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:30 PM
Creation date
6/6/2014 8:16:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2014009
IBM Index Class Name
PERMIT FILE
Doc Date
6/3/2014
Doc Name
New NOI Form 2
From
New West Reclamation, LLC
To
DRMS
Email Name
DMC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.2 Practice Implementation: <br />The Stormwater Management Plan stabilization provisions will be applied to each <br />sampled site upon completion of all samples being obtained. It is anticipated <br />within 15 days of an affected area being created, the Stormwater Management <br />Plan provisions will be installed at a sampled site. Given the small, limited aerial <br />extent of any one sampled site (The auger sampled sites affected area will <br />approximate 10 ft. by 10 ft. and the backhoe sampled sites will approximate 20 ft. <br />by 20ft.), even if a storm event occurred, little if any significant runoff is expected <br />to occur from a sampled site. Waiting to install the Stormwater management <br />stabilization provisions until the waste dump is sampled will ensure a more <br />efficient stabilization installation process with little erosion or runoff. <br />Alternatively, it may be efficient for the Stormwater Management Plan provisions <br />to be installed once the prospecting samples are obtained. Installation would <br />occur prior to demobilization and moving off the waste dump. <br />('The exception to concurrent sample site reclamation will be sampling completed <br />during winter or snowfall months. During the winter sampling, we will complete <br />what backfilling and other sample site reclamation is logical to complete, given <br />site specific conditions. The winter sampled sites will be checked in the spring, <br />after snow melt, for implementation of any corrective actions necessary to <br />stabilize the site.) <br />3.3 Installation Crew: <br />The installation of the Stormwater Management Plan provisions will be handled <br />by a crew of one to three persons and should take no more than 30 minutes per <br />sampled waste dump site. The size of the installation crew may be increased <br />depending on site circumstances and installation issues. <br />3.4 Equipment: <br />Installation of the Stormwater Management Plan provisions will not require <br />mobile equipment. Given the small aerial extent (The auger sampled sites <br />affected area will approximate 10 ft. by 10 ft. and the backhoe sampled sites will <br />approximate 20 ft. by 20ft.) Only hand equipment and manual labor will likely <br />be used to install storm water BMP's. The hand sampled sites will be backfilled <br />and compacted. Covering will be applied since the affected area will be less than <br />4 to 9 square ft. <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.