Laserfiche WebLink
Peabody Sage Creek Mining, LLC <br />Page 5 <br />0514/2014 <br />pH was below the minimum value of 6.5 with a <br />value of 6.44 <br />10. Interim <br />CWQCC regulation <br />It was determined that bed rock groundwater <br />Narrative Standard <br />41 <br />points of compliance are unwarranted at the <br />for Ground Water <br />PSCM mine. Well SGAL70 serves as the PSCM <br />Grassy Creek Alluvial ground water point of <br />compliance. No exceedances of the <br />parameters set forth were exceeded during <br />the 2013 water year. <br />11. Sampling <br />Volume 1, p. 2.04- <br />The report indicates that all frequencies were <br />frequency at <br />107 of CDRMS <br />met. <br />surface water <br />mining permit C- <br />2009 -087 <br />12. Parameters to <br />Volume 1, p. 2.04- <br />All required parameters were analyzed. <br />be sampled at <br />108 of CDRMS <br />surface water sites <br />mining permit C- <br />2009 -087 <br />13. Filing <br />CDRMS regulation <br />Sediment ponds associated with C- 2009 -087 <br />frequency of pond <br />4.05.9(17) <br />include Ponds 002, 003, 004, Pecoco, the <br />reports <br />upper sump, the lower sump, and the portal <br />#1 and #2 sumps. Quarterly pond inspections <br />were conducted within the appropriate <br />quarter. <br />14. Timely filing of <br />CDRMS regulation <br />Quarterly pond inspection reports were <br />pond reports <br />4.05.9(17) <br />submitted and received by the Division within <br />an appropriate timeframe. <br />15. Content of <br />CDRMS regulation <br />All required information was addressed on <br />pond reports <br />4.05.9(15) <br />quarterly sediment pond inspection in water <br />year 2013. <br />16. Sampling <br />Volume 1, p. 2.04- <br />The permitted sampling frequency was in <br />frequency of ground <br />104 of CDRMS <br />compliance at all ground water monitoring <br />water monitoring <br />mining permit C- <br />sites. <br />