Laserfiche WebLink
Apri122, 2014 C- 1982 - 057 /Seneca 11 -W Mine JHB <br />Considerable flow was coming down PM -2 but the drainage was holding up well. <br />Stocktanks <br />Stocktank T -24 was dry and well vegetated. <br />Stocktank T -22 is full of sediment, effectively slows flow coming down the channel but currently does not match <br />the design as shown in the permit. <br />Stocktank T -20 was discharging. (Photo 8) Inflow and embankment of T -20 is fine. <br />T -18 was holding a pool of water. Waterfowl were using the pond at the time of the inspection. A Kildeer or <br />Plover was observed on the island in the stocktank. A spring emanating from the slump on the south side of the <br />pond is flowing heartily. Burrows were noted on the inslope of T -18 embankment. The burrows look like they <br />could be muskrat burrows. Filling of the burrows is needed to keep embankment secure. <br />Stocktank T -5 was discharging but stocktank appeared stable and not compromised by slump located on slope <br />south of this stock tank. <br />T -2 and T -3 were both full of water. <br />Culverts: G2 was functioning well. <br />G5 outlet is clear and flowing well. Inlet to G5 had rocks and sediment extending approx. 2 ft. into the culvert. <br />This culvert inlet requires clean out. <br />Culvert PM -15 inlet is still snow covered. Outlet is fine. Road G needs additional grading at this culvert to assure <br />runoff is directed into the ditch and running off onto the reclamation (gravel flushed onto road <br />embankment). (Photo 5) <br />PM -2 has rocks at the mouth of the outlet. SCC needs to clear these rocks. <br />J3 inlet was fine but silt fence down slope from the outlet is full of sediment. The silt fence is falling down. Clean <br />out and repair of the silt fence is needed. <br />J4 Inlet is armored and is fine. Outlet silt fence is full of sediment and is falling down. Cleanout and repair of the <br />silt fence is needed. <br />J6- Inlet and outlet of the culvert are clear. Silt fence at the edge of the disturbance is full of sediment and falling <br />down. Clean out and repair of the silt fence is needed. <br />Ditches. <br />There are 3 contour ditches in the 005 basin that direct runoff from G road to drainage 005 -E1. Please assure that <br />these contour ditches are depicted on a map. <br />The eastern contour ditch is undercutting near the intersection with drainage 005 -E1. Repairs are needed to assure <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 4 of 14 <br />