Laserfiche WebLink
27 -Bldg Footprints <br />Footnotes are at the bottom of the second page <br />Revised MDE (3- 10 -14) <br />3/21/2014 <br />2014 Estimate for Reclamation of Building Footprint Areas <br />Dozer <br />Truck Haul <br />Scraper Haul <br />Productivity (cy /hr) <br />Weighted Avg <br />Reclamation Area <br />Acres <br />Push Yardage <br />Fill Yardage <br />TS Yardage <br />of Scraper Haul <br />Vol x Prod. <br />Productivity <br />ADR Footprint Area <br />4.0 <br />3,226 <br />300 <br />967,800 <br />Crusher Area <br />76.2 <br />44,907 <br />61,455 <br />150 <br />9,218,295 <br />Crusher Ponds ( #1, #2, #011) <br />incl abv <br />8,691 <br />incl abv <br />Victor Plantsite <br />8.0 <br />6,452 <br />150 <br />967,800 <br />Emulsion Plant <br />1.0 <br />807 <br />217 <br />175,011 <br />Engineering Pkg Lot + Bldg Footprint <br />1.0 <br />807 <br />200 <br />161,400 <br />New Exploration Building (Added 2011) <br />1.0 <br />800 <br />200 <br />160,000 <br />Total = <br />91.2 <br />44,907 <br />8,691 <br />73,547 <br />11,650,306 <br />158.41 cy /hr <br />Activity <br />Units <br />Work Hours <br />Eqmt Cost <br />Labor Cost <br />Material Cost <br />Total Cost <br />Verifications / Checks <br />'Grading ADR Footprint Area (ac) <br />4.0 <br />8.00 <br />$ 1,954 <br />$ 263 <br />included <br />$ 2,217 <br />$ 554.28 $ /ac <br />D9 Rate (hrs /ac) <br />2 <br />'Grading Crusher Footprint Area (cy) <br />44,907 <br />51.93 <br />$ 16,244 <br />$ 1,706 <br />included <br />$ 17,950 <br />$ 0.40 $ /cy <br />D10 Rate (cy /hr) <br />864.79 <br />with experienced operator, <br />level push, <br />and 83% job efficiency <br />2Filling Crusher Ponds ( #1, #2, #011) w/ Clean Fill <br />8,691 <br />773 Truck (cy /hr) <br />489 <br />17.78 <br />$ 3,935 <br />$ 561 <br />included <br />$ 4,496 <br />$ 0.52 $ /cy <br />988 Loader (cy /hr) <br />978 <br />8.89 <br />$ 2,051 <br />$ 292 <br />included <br />$ 2,343 <br />$ 0.27 $ /cy <br />14 H Grader <br />Truck Hrs /4 <br />4.44 <br />$ 564 <br />$ 145 <br />included <br />$ 709 <br />$ 0.08 $ /cy <br />5K gal H2O Truck <br />Truck Hrs /4 <br />4.44 <br />$ 828 <br />$ 137 <br />included <br />$ 966 <br />$ 0.11 $ /cy <br />D4 Dozer <br />Truck Hrs /1.5 <br />11.85 <br />$ 542 <br />$ 389 <br />included <br />$ 931 <br />$ 0.11 $ /cy <br />'Grading Victor Plantsite Footprint Area <br />8.0 <br />16.00 <br />$ 3,909 <br />$ 526 <br />included <br />$ 4,434 <br />$ 554.28 $ /ac <br />D9 Rate (hrs /ac) <br />2 <br />'Grading Emulsion Plantsite Footprint Area <br />1.0 <br />2.00 <br />$ 489 <br />$ 66 <br />included <br />$ 554 <br />$ 554.28 $ /ac <br />D9 Rate (hrs /ac) <br />2 <br />'Grading Engineering Bldg + Pkg Lot <br />1.0 <br />2.00 <br />$ 489 <br />$ 66 <br />included <br />$ 554 <br />$ 554.28 $lac <br />D9 Rate (hrs /ac) <br />2 <br />'Haul Growth Medium to All Footprint Areas (cy) <br />73,547 <br />389.96 <br />$ 86,506 <br />$ 12,562 <br />included <br />$ 99,068 <br />$ 1.35 $ /cy <br />623 Scraper (cy /hr) <br />188.60 <br />14 H Grader <br />Scraper Hrs /4 <br />97.49 <br />$ 12,365 <br />$ 3,182 <br />included <br />$ 15,548 <br />$ 0.21 $ /cy <br />5K gal H2O Truck <br />Scraper Hrs /4 <br />97.49 <br />$ 18,171 <br />$ 3,015 <br />included <br />$ 21,185 <br />$ 0.29 $ /cy <br />°Spread growth medium (cy) <br />73,547 <br />103.59 <br />$ 25,305 <br />$ 3,403 <br />included <br />$ 28,708 <br />$ 0.39 $ /cy <br />D9 Rate(cy /hr) <br />710 <br />5Soil Analyses ( #) <br />18 <br />included <br />included <br />$ 413 <br />$ 413 <br />Rate (ac / sample) <br />5 <br />Footnotes are at the bottom of the second page <br />Revised MDE (3- 10 -14) <br />3/21/2014 <br />