Laserfiche WebLink
26- Powerlines <br />2014 MLE2 Estimated Powerline Removal Costs <br />Using Actual Costs at CCV for retiring power lines in the Phase V area of the AGVLF <br />rding to Marc Tidquist of CC &V the MLE Project will eventually utilize 99 poles of which approx. 74 poles were built <br />Based On 2010 Actual Costs for Retiring Power Lines for Amendment No. 9 in VLF Phase V area. Information Pro fed by Mike Jahraus, Projects <br />Manager for CC &V (2010 costs inflated to 2014$). <br />74 comes from 18,500 ft of <br />14 Costs for Retiring Poles 114 Poles at $ 489.28 Based on real -life powerline divided by 250 ft <br />114 comes from 40 costs in 2010 inflated to 2014$ spacing. Information provided <br />existing in 2007 + 74 by M. Tidquist (1- 12 -12) <br />for MILE Project <br />Grand Total Powerline Removal Cost = 55,778 <br />osts basis: Actual CC &V Experience on Removal of Phase 5 Powerline (2010); 2014$ _ ($458) x (1.0683 CPI Ratio) _ $489.28 <br />eans 2014, p. 36: $350 Poles + $128 Appputenances = $478 <br />MLE2 Poles added by MDE 1 -23 -12 <br />Revised by MDE (3- 10 -14) <br />3/21/2014 <br />