25 -Roads <br />2014 Estimate of Road Reclamation Costs <br />Assumptions <br />For MLE2 all of the road disturbance is otherwise inluded withtin boundaries of other units. Therefore there will be no associated costs for external road <br />reclamation. <br />Activity Units Work Hours <br />Eqmt Cost Labor Cost Material Cost Total Cost Verifications / Checks <br />Grading Road Areas (cy) <br />$ $ included $ <br />D10 Rate (cy /hr) <br />2Haul Growth Medium (cy) - <br />$ $ included $ <br />623 Scraper (cy /hr) 230 <br />'Spread Growth Medium (cy) - <br />$ $ included $ <br />D9 Rate(cy /hr) 710 <br />"Rip & Fertilize (ac) - <br />$ $ $ $ <br />D4 Rate (ac /hr) 1.7 <br />5Seed & Harrow (ac) - <br />$ $ $ $ <br />D4 Rate (ac/hr) 2.3 <br />6Hand Seed (ac) - <br />N/A $ $ $ <br />Rate (ac /hr) 1.0 <br />7Hydro- Mulching (ac) - <br />$ - $ $ $ <br />Rate (ac /hr) 0.6 <br />$Plant Trees (ac) - <br />N/A $ $ $ <br />Rate (ac /hr) 0.67 <br />Total Work Hours = <br />9Supervisor (work hrs /4) <br />$ - $ included $ <br />$ <br />Revised MDE (3- 10 -14) <br />Road Reclamation Costs = <br />Assumes grading will be done with conventional D10 dozer <br />Seeding & harrowing will be conducted on all regraded area traversible with conventional equipment <br />2Growth Medium Replacement fleet will consist of 623 scrapers (3) <br />6Assumes minimal amount of the area will require hand - seeding to achieve revegetation <br />3Growth Medium will be spread using a D -9 dozer to a depth of 6 inches <br />7Mulching will be conducted using conventional hydro- seeder /hydro - mulcher <br />"Ripping & fertilizing will be conducted using a conventional D4 dozer with a cyclone spreader BTrees and shrubs w II be planted on all areas of reclaimed roadways <br />9Supervisor costs are figured at 25 % of the total work hours to accomplish the reclamation effort <br />