DEMOLITION COST ESTIMATE <br />Demolition Costs Associated with High Grade Mill Facility to Support <br />MLE2 Project <br />Name of Structure <br />Number Tanks / Length (feet) Width (feet) Height (feet) <br />Volume (cu ft) <br />'Cost per cu ft <br />Total Cost ($) <br />Structure Type [some dimensions in gallons; others in <br />square feet] <br />Mill Building Main Structure (includes whse, milling <br />Steel and 67,053 sq ft 86 <br />5,766,558 <br />$ <br />0.36 <br />$ <br />2,075,961 <br />area, shop, electrical, and interior offices) <br />Concrete <br />Mill West Tank Farm <br />St & Cone 14,721 sq ft 8 <br />117,768 <br />$ <br />0.36 <br />$ <br />42,396 <br />Mill East Tank Farm <br />St & Cone 13,855 sq ft 8 <br />110,840 <br />$ <br />0.36 <br />$ <br />39,902 <br />Mill Substation (NW corner of Mill Bldg) <br />St & Cone 4,207 sq ft 15 <br />63,105 <br />$ <br />0.36 <br />$ <br />22,718 <br />Project Office A <br />ST & Wood 3,000 sq ft 10 <br />30,000 <br />$ <br />0.36 <br />$ <br />10,800 <br />Project Office B <br />ST & Wood 1,440 sq ft 10 <br />14,400 <br />$ <br />0.36 <br />$ <br />5,164 <br />Project Office C <br />ST & Wood 900 sq ft 10 <br />9,000 <br />$ <br />0.36 <br />$ <br />3,240 <br />Project Office D <br />ST & Wood 1,440 sq ft 10 <br />14,400 <br />$ <br />0.36 <br />$ <br />5,184 <br />Project Office E <br />ST & Wood 900 sq ft 10 <br />9,000 <br />$ <br />0.36 <br />$ <br />3,240 <br />High pH Thickener (SW of MITI) All Tanks are <br />1 64,000 gal <br />8,556 <br />$ <br />0.36 <br />$ <br />3,080 <br />Concentrate Thickener (W of Mill) Steel <br />1 64,000 gal <br />8,556 <br />$ <br />0.36 <br />$ <br />3,080 <br />Process Water Tank (SE of Mill) <br />1 415,000 gal <br />55,481 <br />$ <br />0.36 <br />$ <br />19,973 <br />Processed Ore Thickener (SE of Mill Bldg) <br />1 360,000 gal <br />48,128 <br />$ <br />0.36 <br />$ <br />17,326 <br />NaCN Storage Tanks (2) <br />2 25,000 gal <br />6,684 <br />$ <br />0.36 <br />$ <br />2,406 <br />Leach Tanks (6) <br />6 173,000 gal <br />138,770 <br />$ <br />0.36 <br />$ <br />49,957 <br />Conveyor for Agglomerator Discharge <br />St & Cone 1,000 4 6 <br />24,000 <br />$ <br />0.36 <br />$ <br />8,640 <br />Conveyor for Rod Mill Feed <br />St & Cone 250 4 6 <br />6,000 <br />$ <br />0.36 <br />$ <br />2,160 <br />Subtotal Mill <br />Bldg, Conveyors, and Tanks <br />$ <br />2,315,249 <br />Note: Dimensions and information for Mill Bldg, Tanks and Appurtenances Table are from Drawings Provided by D. <br />Larson plus <br />email from M. Jahraus to M. Ellis (1- 12 -12) and personal consultation with CC &V Processing Manager, K. Riley (1- 12 <br />-12) <br />Some dimensions were estimates by M. Ellis (1- 12 -12) <br />Demolition Costs Associated with Ironclad Facility and Other CC &V Structure Upgrades <br />to Support <br />MLE2 Project <br />Structure Width Height <br />Length (feet) <br />Volume (cu ft) <br />Cost per cu ft <br />Total Cost ($) <br />Name of Structure <br />Type feet (feet) <br />Buckley Explosives Truck Garage (new bldg) <br />7,600 sf = footprint area 18.0 <br />136,800 <br />$ <br />0.36 <br />$ <br />49,248 <br />Ironclad Office Annex (add -on to existing bldg) <br />4,800 sf = footprint area 13.0 <br />62,400 <br />$ <br />0.36 <br />$ <br />22,464 <br />Maintenance Department Annex (add -on to existing) <br />75 25.0 65.0 <br />121,675 <br />V <br />$ <br />0.36 <br />$ <br />43,875 <br />Laboratory Addition (add -on to existing bldg) <br />Steel 30 15 10 <br />4500 <br />$ <br />0.36 <br />$ <br />1,620.00 <br />Subtotal Miscellaneous Structures <br />$ <br />117,207 <br />This table has been revised by MDE 3 -4 -14 <br />11- Demolition <br />3/21/2014 <br />