Laserfiche WebLink
DEMOLITION COST ESTIMATE <br />Demolition Costs Associated with Tanks and Appurtenances at SGADR Facility to Support MLE2 Project <br />Number of Length (feet) Width or Height (feet) Volume (cu ft) 'Cost per cu ft Total Cost ($) <br />Name of Structure Tanks Dia(feet) <br />[some dimensions in aallonsl <br />Carbon Columns <br />20 <br />12.5 <br />11 <br />26,984 <br />$ <br />0.36 <br />$ <br />9,714 <br />Intermediate Solution Tank <br />1 <br />16 <br />40 <br />8,038 <br />$ <br />0.36 <br />$ <br />2,894 <br />Barren Solution Tanks (N of Bldg) <br />2 <br />110,000 <br />29412 <br />$ <br />0.36 <br />$ <br />10,588 <br />Acid Mix Tank (W of Bldg) <br />1 <br />8,000 <br />1,070 <br />$ <br />0.36 <br />$ <br />385 <br />Acid Neutralization Tank (W of Bldg) <br />1 <br />8,000 <br />1,070 <br />$ <br />0.36 <br />$ <br />385 <br />Acid Neutralization / Scrubber Tank (W of Bldg) <br />1 <br />8,000 <br />1,070 <br />$ <br />0.36 <br />$ <br />385 <br />Concentrated Acid Storage Tank (W of Bldg) <br />1 <br />7,000 <br />936 <br />$ <br />0.36 <br />$ <br />337 <br />Sodium Hydroxide Tank (W of Bldg) <br />1 <br />20,000 <br />2,674 <br />$ <br />0.36 <br />$ <br />963 <br />Carbon Regeneration Kiln <br />1 <br />3.3 <br />34 <br />291 <br />$ <br />0.36 <br />$ <br />105 <br />Carbon Feed Tank All Tanks are <br />1 <br />10 <br />16 <br />1,256 <br />$ <br />0.36 <br />$ <br />452 <br />Carbon Quench Tank Steel <br />1 <br />9 <br />11.1 <br />706 <br />$ <br />0.36 <br />$ <br />254 <br />Carbon Strip Vessel <br />1 <br />5 <br />30.8 <br />604 <br />$ <br />0.36 <br />$ <br />218 <br />Pregnant Solution Tanks <br />2 <br />20,000 <br />5,348 <br />$ <br />0.36 <br />$ <br />1,925 <br />Blowcase Vessel (Cost Estimated by MDE) <br />1 <br />Lump Sum <br />300 <br />Carbon Fines Tank (Cost Est. by MDE) <br />1 <br />Lump Sum <br />500 <br />Transfer Water Tank <br />1 <br />5,000 <br />668 <br />$ <br />0.36 <br />$ <br />241 <br />Pretreatment Solution Tank <br />1 <br />4,500 <br />602 <br />$ <br />0.36 <br />$ <br />217 <br />NaCN Storage Tanks (two at 25K gallons) <br />2 <br />25,000 <br />6,684 <br />$ <br />0.36 <br />$ <br />2,406 <br />New Carbon Attrition Tank <br />1 <br />1,000 <br />134 <br />$ <br />0.36 <br />$ <br />48 <br />Electrolytic Cell Tanks (2) <br />2 <br />1,000 <br />267 <br />$ <br />0.36 <br />$ <br />96 <br />Subtotal for <br />SGADR Tanks <br />$ <br />32,413 <br />Dimensions and information for this SGADR Tanks and Appurtenances Table <br />are from FLSmidth / CEntry <br />Drawing <br />No. 20- 641 <br />-02 plus <br />email from M. Jahraus to M. Ellis (1- 12 -12) and personal consultation with CC &V Processing Manager, K. Riley (1- 12 -12) <br />This table has been revised by MDE (3 -4-14) <br />11- Demolition <br />3/21/2014 <br />