My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-14_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-04-14_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 8:00:05 AM
Creation date
4/15/2014 3:19:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/14/2014
Doc Name
Annual fee report & map
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION COST ESTIMATE <br />Demolition Costs Associated with Proposed Structures at Souaw Gulch Valley <br />Leach Facility to Support <br />MLE2 Project <br />Type of <br />Length (feet) <br />Width Height <br />Volume (cu ft) <br />'Cost per cu ft <br />Total <br />Cost ($) <br />Name of Structure <br />Structure <br />feet feet <br />(some dimensions in sq ft] <br />MCC Building <br />Steel & <br />1,620 <br />sq ft <br />12 <br />19,440 <br />$ <br />0.36 <br />$ <br />6,998 <br />Concrete <br />Squaw Warehouse <br />Steel & <br />8,320 <br />sq ft <br />32 <br />266,240 <br />$ <br />0.36 <br />$ <br />95,846 <br />Concrete <br />Low Volume Solution Collection (LVSC) Pump <br />Wood & Steel <br />1,510 <br />sq ft <br />12 <br />18,120 <br />$ <br />0.36 <br />$ <br />6,523 <br />Shed <br />SGADR Building <br />Steel & <br />164.5 <br />200 <br />62 <br />2,039,800 <br />$ <br />0.36 <br />$ <br />734,328 <br />Concrete <br />SGADR Utility Bldg (S. Side of ADR attached) <br />Steel & <br />Concrete <br />60.0 <br />30 <br />17 <br />30,600 <br />$ <br />0.36 <br />$ <br />11,016 <br />Squaw Security Building <br />Steel & <br />2,860 <br />sq ft <br />10 <br />28,600 <br />$ <br />0.36 <br />$ <br />10,296 <br />Concrete <br />Squaw Modular Office Building #1 <br />Steel & <br />60.0 <br />66 <br />10 <br />39,600 <br />$ <br />0.36 <br />$ <br />14,256 <br />Concrete <br />Squaw Modular Office Building #2 <br />Steel & <br />Concrete <br />60.0 <br />66 <br />10 <br />39,600 <br />$ <br />0.36 <br />$ <br />14,256 <br />Squaw Modular Office Building #3 <br />Steel & <br />Concrete <br />12.0 <br />66 <br />10 <br />7,920 <br />$ <br />0.36 <br />$ <br />2,851 <br />Squaw Electrical Substation (only 40% of the <br />Steel <br />26,728 <br />sq ft <br />15 <br />400,920 <br />$ <br />0.36 <br />$ <br />144,331 <br />area will have structures) <br />Squaw Auxiliary Building "B" <br />Steel & <br />918 <br />sq ft <br />10 <br />9,180 <br />$ <br />0.36 <br />$ <br />3,305 <br />Concrete <br />Squaw Auxiliary Building "C" <br />Steel & <br />400 <br />sq ft <br />10 <br />4,000 <br />$ <br />0.36 <br />$ <br />1,440 <br />Concrete <br />Squaw Auxiliary Building "A" <br />Steel & <br />Concrete <br />1,311 <br />sq ft <br />10 <br />13,110 <br />$ <br />0.36 <br />$ <br />4,720 <br />SUBTOTAL SGVLF Buildings $ <br />1,050,167 <br />2014 Means Heavy Construction Cost Data, p.37. <br />This table has been revised by MDE <br />(3 -4 -14) <br />Note: Dimensions for these facilities were from FLSmidth <br />/ CEntry drawings <br />20- 641 -02 and 03 for the ADR Building <br />and from <br />Drawing C4 Proposed Facilities Mae for MLE2 with ACAD measurements _provided by J. Snyder of Norwest 1- 12 -12) <br />11- Demolition <br />3/21/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.