Laserfiche WebLink
DEMOLITION COST ESTIMATE <br />Demolition Costs Associated with Proposed Structures at Souaw Gulch Valley <br />Leach Facility to Support <br />MLE2 Project <br />Type of <br />Length (feet) <br />Width Height <br />Volume (cu ft) <br />'Cost per cu ft <br />Total <br />Cost ($) <br />Name of Structure <br />Structure <br />feet feet <br />(some dimensions in sq ft] <br />MCC Building <br />Steel & <br />1,620 <br />sq ft <br />12 <br />19,440 <br />$ <br />0.36 <br />$ <br />6,998 <br />Concrete <br />Squaw Warehouse <br />Steel & <br />8,320 <br />sq ft <br />32 <br />266,240 <br />$ <br />0.36 <br />$ <br />95,846 <br />Concrete <br />Low Volume Solution Collection (LVSC) Pump <br />Wood & Steel <br />1,510 <br />sq ft <br />12 <br />18,120 <br />$ <br />0.36 <br />$ <br />6,523 <br />Shed <br />SGADR Building <br />Steel & <br />164.5 <br />200 <br />62 <br />2,039,800 <br />$ <br />0.36 <br />$ <br />734,328 <br />Concrete <br />SGADR Utility Bldg (S. Side of ADR attached) <br />Steel & <br />Concrete <br />60.0 <br />30 <br />17 <br />30,600 <br />$ <br />0.36 <br />$ <br />11,016 <br />Squaw Security Building <br />Steel & <br />2,860 <br />sq ft <br />10 <br />28,600 <br />$ <br />0.36 <br />$ <br />10,296 <br />Concrete <br />Squaw Modular Office Building #1 <br />Steel & <br />60.0 <br />66 <br />10 <br />39,600 <br />$ <br />0.36 <br />$ <br />14,256 <br />Concrete <br />Squaw Modular Office Building #2 <br />Steel & <br />Concrete <br />60.0 <br />66 <br />10 <br />39,600 <br />$ <br />0.36 <br />$ <br />14,256 <br />Squaw Modular Office Building #3 <br />Steel & <br />Concrete <br />12.0 <br />66 <br />10 <br />7,920 <br />$ <br />0.36 <br />$ <br />2,851 <br />Squaw Electrical Substation (only 40% of the <br />Steel <br />26,728 <br />sq ft <br />15 <br />400,920 <br />$ <br />0.36 <br />$ <br />144,331 <br />area will have structures) <br />Squaw Auxiliary Building "B" <br />Steel & <br />918 <br />sq ft <br />10 <br />9,180 <br />$ <br />0.36 <br />$ <br />3,305 <br />Concrete <br />Squaw Auxiliary Building "C" <br />Steel & <br />400 <br />sq ft <br />10 <br />4,000 <br />$ <br />0.36 <br />$ <br />1,440 <br />Concrete <br />Squaw Auxiliary Building "A" <br />Steel & <br />Concrete <br />1,311 <br />sq ft <br />10 <br />13,110 <br />$ <br />0.36 <br />$ <br />4,720 <br />SUBTOTAL SGVLF Buildings $ <br />1,050,167 <br />2014 Means Heavy Construction Cost Data, p.37. <br />This table has been revised by MDE <br />(3 -4 -14) <br />Note: Dimensions for these facilities were from FLSmidth <br />/ CEntry drawings <br />20- 641 -02 and 03 for the ADR Building <br />and from <br />Drawing C4 Proposed Facilities Mae for MLE2 with ACAD measurements _provided by J. Snyder of Norwest 1- 12 -12) <br />11- Demolition <br />3/21/2014 <br />