Laserfiche WebLink
DEMOLITION COST ESTIMATE <br />Bulk Emulsion Facility <br />Building <br />Length <br />Width <br />Peak <br />Eave <br />Cu.Ft. <br />$ /Cu.Ft.t <br />Cost <br />Main Building <br />60 <br />40.0 <br />17.0_ <br />12.0 <br />34,8.00 <br />$ <br />0.36 <br />$ <br />12,528 <br />Height <br />_ <br />Small Bulk Bin <br />10 <br />10.0 <br />20.0 <br />2,00.0 <br />$ <br />0.36 <br />$ <br />720 <br />Stem Walls <br />Sq. Ft. <br />$ /Sq Ft.' <br />Building <br />140 <br />2.0 <br />280 <br />$ <br />15.94 <br />$ <br />4,463 <br />Solution Tank Containment <br />96 <br />2.0 <br />192 <br />$ <br />15.94 <br />$ <br />3,060 <br />Fuel Tank Containment <br />56 <br />2.0 <br />112 <br />$ <br />15.94 <br />$ <br />1,785 <br />Outside Fuel Tank Containment <br />42 <br />2.0 <br />84 <br />$ <br />15.94 <br />$ <br />1,339 <br />No. <br />Diameter <br />Radius <br />Height <br />Cu.Ft. <br />$ /Cu.Ft.1 <br />Cost <br />Bulk Bins (1 Anfo, 3 Emulsion) <br />4 <br />0 <br />- <br />- <br />9,482 <br />$ <br />0.36 <br />$ <br />3,414 <br />SST Solution Tanks <br />2 <br />12 <br />6.0 <br />15.0 <br />3,391 <br />$ <br />0.36 <br />$ <br />1,221 <br />Fuel Holding Tank <br />1 <br />10 <br />5.0 <br />10.0 <br />785 <br />$ <br />0.36 <br />$ <br />283 <br />Fuel Holding Tank <br />1 <br />8 <br />4.0 <br />10.0 <br />502 <br />$ <br />0.36 <br />$ <br />181 <br />Outside Fuel Holding Tank <br />1 <br />10 <br />5.0 <br />10.0 <br />785 <br />$ <br />0.36 <br />$ <br />283 <br />Prill Silo <br />4 <br />10.0 <br />20 <br />25,120 <br />$ <br />0.36 <br />$ <br />9,043 <br />Engineering Facility <br />New Engineering Building (2007) <br />9,324 <br />sf = footprint area <br />13.0 <br />121,212 <br />$ <br />0.38 <br />$ <br />46,061 <br />SUBTOTAL <br />$ <br />84,380 <br />2014 Means Heavy Construction Cost Data, p. 37. <br />2Pro-rated using historic costs and increase in Mixed <br />Means Cost from 2009 to 2014. <br />Demolition Costs Associated with E -Train Project of the AGVLF <br />Type of <br />Length (feet) <br />Width <br />Height <br />Volume (cu ft) <br />Cost per cu ft <br />Total Cost ($) <br />Name of Structure <br />Structure <br />feet <br />(feet) <br />AGADR Building Expansion Area for New (2010) Steel and <br />142 <br />42 <br />53 <br />316,092 <br />$ <br />0.36 <br />$ <br />113,793 <br />E -Train <br />Concrete <br />MCC & Fume Scrubber Room <br />Steel and <br />37 <br />16 <br />16 <br />9,472 <br />$ <br />0.36 <br />$ <br />3,410 <br />Concrete <br />Enrichment Pump Station <br />Steel and <br />60 <br />30 <br />38 <br />68,400 <br />$ <br />0.36 <br />$ <br />24,624 <br />Concrete <br />Phase 5 - Preg Pump Electrical MCC Bldg. <br />Steel and <br />22 <br />22 <br />17 <br />8,228 <br />$ <br />0.36 <br />$ <br />2,962 <br />Concrete <br />Phase 5 - Preg & Enrichment Pumping Electrical <br />Steel and <br />42 <br />22 <br />17 <br />15,708 <br />$ <br />0.36 <br />$ <br />5,655 <br />MCC Bldg. <br />Concrete <br />Phase 5 - Preg & Enrichment Pumping LVSC <br />Steel and <br />20 <br />10 <br />12 <br />2,400 <br />$ <br />0.36 <br />$ <br />864 <br />Pump Control Shed <br />Concrete <br />SUBTOTAL <br />$ <br />161,308 <br />' R.S. Means Heavy Construction Cost Data for 2010 page 33. <br />2Note: Building dimensions are from FLSmidth / Centry Drawings provided by M. Jahraus <br />(February 2010) <br />This table has been <br />revised by MDE (3 -4 <br />-14) <br />New Exploration Building <br />Steel and <br />150 <br />65 <br />18 <br />175,500 <br />$ <br />0.36 <br />$ <br />63,180 <br />Concrete <br />11- Demolition <br />3/21/2014 <br />