My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-14_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-04-14_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2020 8:00:05 AM
Creation date
4/15/2014 3:19:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
4/14/2014
Doc Name
Annual fee report & map
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION COST ESTIMATE <br />Process Solution Enhancement ( "PSE ") Facility Demolition Costs <br />Description of Structure <br />eo <br />Structure <br />Length (feet) Width (feet) Height (feet) Volume (cu ft) <br />Cost per cu ft <br />Total Cost ($) <br />Main PSE Building <br />Steel <br />180 108 55 <br />1,069,200 <br />$ 0.36 <br />$ 384,912 <br />PS Stabilization Tank (outside bldg) <br />concrete <br />(95 ft dia x 23 ft high) <br />162,946 <br />$ 0.50 <br />$ 81,473 <br />CoMag Clarifier Tank (outside bldg) <br />Concrete <br />(70 ft dia x 23 ft high) <br />88,470 <br />$ 0.50 <br />$ 44,235 <br />Coagulant Storage Tank (outside bldg) <br />Fiberglass <br />(50 ft dia x 23 ft high) <br />2,713 <br />$ 0.20 <br />$ 543 <br />Precoat Silo (outside bldg) <br />Steel <br />(50 ft dia x 23 ft high) <br />6,154 <br />$ 0.36 <br />$ 2,215 <br />CoMag Train Process Tanks (inside bldg) x 8 tanks <br />concrete <br />17.25 15.5 17 <br />36,363 <br />$ 0.50 <br />$ 18,182 <br />Wet Wells (inside bldg) x 2 wells <br />Concrete <br />32 16 24 <br />24,576 <br />$ 0.50 <br />$ 12,288 <br />Soda Ash Mix Tank (inside bldg) <br />Steel <br />(8 ft dia x 8 ft high) <br />402 <br />$ 0.36 <br />$ 145 <br />Precoat Mix Tank (inside bldg) <br />Steel <br />(6 ft dia x 6 ft high) <br />170 <br />$ 0.36 <br />$ 61 <br />PSE Thickener Polymer Mix Tank (inside bldg) <br />steel <br />(7 ft dia x 9 ft high) <br />346 <br />$ 0.36 <br />$ 125 <br />PSE Conditioning Tank (inside bldg) <br />Steel <br />(6 ft dia x 8 ft high) <br />226 <br />$ 0.36 <br />$ 81 <br />Polymer Storage Tank (inside bldg) <br />Fiberglass <br />(12 ft dia x 24 ft high) <br />2,713 <br />$ 0.20 <br />$ 543 <br />Magnetite Silo (inside bldg) <br />Steel <br />(8 ft dia x 8 ft high) <br />402 <br />$ 0.36 <br />$ 145 <br />Waste Holding Tank - aka Gravity Thickener / Solids <br />Concrete <br />(50 ft dia x 26 ft high) <br />51,025 <br />$ 0.50 <br />$ 25,513 <br />Storage Tank (outside bldg) <br />Walkways, stairs, platforms and other appurtenances <br />Steel <br />Assume Lump Sum to cover demolition <br />$ 5,000 <br />& removal <br />Type of <br />Length (feet) <br />2Cost per lineal <br />Total Cost ($) <br />Description of Structure <br />Structure <br />foot <br />Piping (external to the ADR and PSE buildings) <br />-North Side from ADR to PSE (6 lines @ 715 ft each) <br />Varies <br />4,290 <br />$ 8.55 <br />$ 36,680 <br />-South Side from CoMag Clarifier to PSE (3 @ 100 ft) <br />Varies <br />300 <br />$ 8.55 <br />$ 2,565 <br />PSE Total = <br />$ 614,704 <br />' R.S. Means Heavy Construction Cost Data for 2014 page 37 for steel <br />and concrete demolition; $0.20 /cu ft for fiberglass <br />estimated by MDE. <br />2R.S. Means Heavy Construction Cost Data for 2014 page 31. <br />Note: Means costs include labor, materials, operating <br />costs, overhead, <br />and profit. <br />Prepared by MDE (10 -5 -12) <br />Revised MDE (3- 11 -14) <br />Grand Total Cost for All Areas of Demolition 2014 Dollars) DRMS Warranty <br />$ 7,344,876 <br />11- Demolition <br />3/21/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.