Laserfiche WebLink
March 2014 Stonewall Springs — QA/QC Plan <br />The CQA Field Representative shall conduct the following prior to and during foundation preparation and <br />clean -up: <br />• Verify the final extent of foundation treatment excavation. <br />• Verify that acceptable cleaning has been performed to the above limits and has been approved <br />by the CQA Engineer and the CQA Director. <br />• Verify the quality and installation of any required foundation treatment materials has been <br />approved by the CQA Engineer and the CQA Director. <br />11 <br />