Laserfiche WebLink
March 2014 <br />• Monitor material selection and placement. <br />• Verify construction is to lines and grades specified. <br />5.4 EARTHFILL/SOIL LINER <br />Stonewall Springs — QA/QC Plan <br />The CQA Field Representative shall conduct the following prior to and during earthfill placement: <br />• Verify site is ready to receive fill materials and that the foundation is suitable <br />• Observe that the native foundation materials are prepared in accordance with the requirements of <br />the specifications. <br />• Monitor lift thickness is within required range. <br />• Verify the earthfill is compacted in accordance with the requirements of the specifications. <br />• Monitor material selection and placement. <br />• Verify construction is to lines and grades specified. <br />10 <br />