My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-09_PERMIT FILE - M2000041
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2000041
>
2014-04-09_PERMIT FILE - M2000041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:11 PM
Creation date
4/10/2014 11:18:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
PERMIT FILE
Doc Date
4/9/2014
Doc Name
Response to Third Adequacy AM01
From
EAI
To
DRMS
Type & Sequence
AM1
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 2014 Stonewall Springs — QA/QC Plan <br />The preliminary schedule for the progress meetings for this project is every Thursday at 9:30 am. <br />The following is a typical agenda for a progress meeting: <br />• Review minutes of previous meetings. <br />• Review work progress. <br />• Review of quality assurance testing. <br />• Field observations, problems, and decisions. <br />• Identification of problem, which impede planned progress. <br />• Review submittals schedule and status of submittals, noting critical submittals. <br />• Review health and safety concerns and issues. <br />• Status of construction schedule. <br />• Corrective measures to regain projected schedules. <br />• Planned progress during succeeding work period. <br />• Coordination of projected progress. <br />• Effect of proposed Change Orders on progress schedule and coordination. <br />• Potential change conditions or review of Change Order submittals. <br />3.3 PROBLEM OR WORK DEFICIENCY MEETINGS <br />When a problem or deficiency is occurring or likely to occur, special meetings will be held to deal with it <br />instead of waiting for the weekly progress meeting. These meetings will be attended by CQA personnel <br />and the Contractor. If necessary, the SEO may also attend. The purpose of these meetings is to identify <br />a problem or deficiency in the construction work, review alternative solutions, and select and implement a <br />plan to resolve the problem or deficiency. The CQA Field Representative will record and distribute <br />minutes of the meeting. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.