Laserfiche WebLink
March 2014 Stonewall Springs — QA/QC Plan <br />• When necessary, designates another of the on -site CQA personnel to act on his behalf whenever <br />he is absent from the site, to ensure continuity during operations. <br />• Assist in and coordinate with the CQA Engineer any proposed changes to the design, Plans, or <br />Special Provisions. <br />• Prepares, with the CQA team, the final completion report. <br />In addition, the CQA Field Representative regularly reports to all parties on a verbal basis to ensure that <br />any problems are identified and resolved on a timely basis. <br />5 <br />