Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN -3 Page 64 of 312 <br />BULLDOZER WORK <br />Task description: Spread Uncompacted Refuse on Gob Pile #2 <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 035 State <br />Date: 1/16/2013 County <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EOL <br />Basic Machine. <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D l OT - l OSU <br />574 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Abbreviation <br />Filename <br />Total unit Cost/Hour: $319.93 <br />Total Fleet Cost/Hour: $1,279.71 <br />MATERIAL OUANTITIES <br />Initial Volume: 200,000 <br />Swell factor: 1.000 <br />Loose volume: 200,000 LCY <br />Source of estimated volume: Page 2.05 -45 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />200 feet <br />946.0 LCY /hr <br />Loose stockpile 1.2 <br />5% <br />6,100 feet <br />2,000 lbs /LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Source <br />'AVG.) <br />None <br />C083 -035 <br />Utilization % <br />Ownership Cost /Hour: <br />$99.15 <br />NA <br />Operating Cost /Hour: <br />$183.36 <br />100 <br />Ripper op. Cost /Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $319.93 <br />Total Fleet Cost/Hour: $1,279.71 <br />MATERIAL OUANTITIES <br />Initial Volume: 200,000 <br />Swell factor: 1.000 <br />Loose volume: 200,000 LCY <br />Source of estimated volume: Page 2.05 -45 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />200 feet <br />946.0 LCY /hr <br />Loose stockpile 1.2 <br />5% <br />6,100 feet <br />2,000 lbs /LCY <br />Weight description: User Provided <br />Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Source <br />'AVG.) <br />None <br />C083 -035 <br />