Laserfiche WebLink
Bowie No. 2 Mine <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Reclamation Cost Estimate RN -3 Page 65 of 312 <br />1.200 <br />(CAT HB) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />1.000 <br />(DOZ -OC) <br />0.903 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />1.150 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.7757 <br />Adjusted unit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />733.81 LCY/hr <br />2935.24 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.436/LCY <br />Total job time: <br />Total job cost: <br />68.14 Hours <br />$87,196.19 <br />