Laserfiche WebLink
Bowie No. 2 Mine <br />Haul Route: <br />Reclamation Cost Estimate RN -3 Page 63 of 312 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />LCY /Hour Adjusted for job efficiency: <br />264.01 LCY /Hour <br />Truck Unit Production <br />min <br />1 <br />5280.00 <br />10.00 <br />5.00 <br />15.00 <br />734 <br />7.199 <br />Haul Time: 7.199 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />minutes <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />LCY /Hour Adjusted for job efficiency: <br />264.01 LCY /Hour <br />Truck Unit Production <br />min <br />1 <br />5280.00 <br />-10.00 <br />5.00 <br />-5.00 <br />2938 <br />1.853 <br />Return Time: 1.853 <br />minutes <br />Total Truck Cycle Time: 12.142 <br />minutes <br />Loading Tool unit <br />Production <br />318.08 <br />LCY /Hour Adjusted for job efficiency: <br />264.01 LCY /Hour <br />Truck Unit Production <br />57.37 <br />LCY /Hour Adjusted for job efficiency: <br />47.62 LCY /Hour <br />Optimal No. of Trucks: <br />6 <br />Truck(s) Selected Number of Trucks: <br />4 Truck(s) <br />Adjusted hourly truck team production: 190.47 <br />LCY /Hour <br />Adjusted single truck/loader team production: 190.47 <br />LCY /Hour <br />Adjusted multiple truck/loader team production: 190.47 <br />LCY /Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 10.50 <br />Hours <br />Unit cost: <br />$2.125 <br />/LCY Total job cost: $4,249.97 <br />