Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN -3 <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />10.00 <br />LCY <br />Heaped Volume: <br />12.00 <br />LCY <br />Average Volume: <br />11.00 <br />LCY <br />Adjusted Volume: <br />12.00 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes <br />Loading Tool Capacity <br />Page 62 of 312 <br />11.61 LCY <br />Bucket Size Class: NA <br />Rated Capacity: 4.300 LCY (heaped) <br />Bucket Fill Factor: 0.675 Blasted rock - poorly blasted (60 - 75 %) 0.675 <br />Adjusted Capacity: 2.903 LCY <br />Job Condition Corrections: Site Altitude (ft.): 7100 feet <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill 4 <br />Excavators and Front Shovels: <br />Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.500 <br />passes <br />minutes <br />Cycle Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill 4 <br />Excavators and Front Shovels: <br />Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.500 <br />passes <br />minutes <br />Cycle Time Factors <br />minutes <br />Factor (min.) <br />Source <br />Material: <br />Bank or broken material 0.04 <br />0.040 <br />(Cat HB) <br />Stockpile: <br />Dumped by truck 0.02 <br />0.020 <br />(Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Fragile target 0.05 <br />0.050 <br />(Cat HB) <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 <br />Truck Load Time: 1.690 <br />Truck Maneuver and Dump Time: 0.90 <br />Truck Travel (Haul & Return) Time: <br />enetration 5.0 <br />Net Cycle Time Adjustment: 0.030 <br />minutes <br />Adjusted Loader Cycle Time: 0.530 <br />minutes <br />Net Load Time per Truck: 1.690 <br />minutes <br />Minutes Adjusted for site altitude: <br />0.500 Minutes <br />Minutes Adjusted for site altitude: <br />1.690 Minutes <br />Minutes Adjusted for site altitude: <br />0.900 Minutes <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />