Laserfiche WebLink
Bowie No. 2 Mine Reclamation Cost Estimate RN -3 <br />BULLDOZER WORK <br />Task description: Backfill and Regrade B -Seam Portal Bench <br />Site: Bowie No. 2 Mine Permit Action: Permit Renewal 3 <br />PROJECT IDENTIFICATION <br />Task #: 015 State <br />Date: 1/16/2013 County <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EOi <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D10T - IOSU <br />574 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Page 36 of 312 <br />Permit /Job #: C 1996083 <br />Abbreviation: None <br />Filename: C083 -015 <br />Total unit Cost /Hour: $341.51 <br />Total Fleet Cost/Hour: $1,366.06 <br />MATERIAL QUANTITIES <br />Initial Volume: 32,000 <br />Swell factor: 1.165 <br />Loose volume: 37,280 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />150 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />20% <br />6,750 feet <br />2.9001bs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Utilization % <br />Ownership Cost /Hour: <br />$110.73 <br />NA <br />Operating Cost /Hour: <br />$183.36 <br />100 <br />Ripper op. Cost /Hour: <br />$10.01 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost /Hour: $341.51 <br />Total Fleet Cost/Hour: $1,366.06 <br />MATERIAL QUANTITIES <br />Initial Volume: 32,000 <br />Swell factor: 1.165 <br />Loose volume: 37,280 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />150 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient <br />Average site altitude: <br />Material weight: <br />20% <br />6,750 feet <br />2.9001bs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />