Laserfiche WebLink
Bowie No. 2 Mine <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Reclamation Cost Estimate RN -3 Page 37 of 312 <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />0.545 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.793 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.1937 <br />Adjusted unit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />240.81 LCY /hr <br />963.24 LCY /hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $1.418 /LCY <br />Total job time: <br />Total job cost: <br />38.70 Hours <br />$52,870.21 <br />