Laserfiche WebLink
Bowie No. 2 Mine <br />Haul Route- <br />Reclamation Cost Estimate RN -3 Page 35 of 312 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />600.00 <br />0.00 <br />3.00 <br />3.00 <br />2983 <br />0.764 <br />Haul Time: <br />Return Rcn te- <br />0.764 <br />minutes <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />600.00 <br />0.00 <br />3.00 <br />3.00 <br />3569 <br />0.381 <br />Return Time: 0.381 <br />Total Truck Cycle Time: 5.145 <br />Loading Tool unit <br />Production 832.76 LCY /Hour Adjusted for job efficiency: <br />Truck Unit Production <br />469.39 LCY /Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 779.18 <br />Adjusted single truck/loader team production: 691.19 <br />Adjusted multiple truck/loader team production: 691.19 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $0.936 /LCY Total job cost: <br />minutes <br />minutes <br />691.19 LCY /Hour <br />389.59 LCY /Hour <br />2 Truck(s) <br />LCY /Hour <br />_ LCY /Hour <br />LCY /Hour <br />89.33 Hours <br />$57,762.63 <br />