Laserfiche WebLink
Mr. Travis Marshall <br />March 6, 2014 <br />Page 5 <br />30. Liberty does not propose an impermeable liner under the waste rock pile. The lack <br />of hazardous levels of constituents in the geochemistry data for samples from above <br />and below the ore zone indicate that no liner is necessary. Further, all waste rock <br />piles are within the zero discharge boundaries of the storm water management plan. <br />As stated in the mining plan all ore will be placed in the concrete lined ore stock pile. <br />Please contact SMA with any questions or further comments you have. <br />Sincerely, <br />SOUDER, MILLER & ASSOCIATES <br />94 <br />Cynthia A. Gray, CHMM <br />Senior Scientist <br />2 � �- 7�— -- G� <br />Reid S. Allan, PG <br />Vice President/Principal Scientist <br />Appendix A: Storm Water Management Plan and Preliminary Drainage Report <br />Appendix B: Figures <br />Appendix C: Weed Control Plan <br />Appendix D: Geochemical Conditions — Lack of Acid Generating Potential <br />Appendix E: Groundwater Information <br />Appendix F: Surface Water Discussion <br />Appendix G: Groundwater Quality Monitoring Plan <br />Appendix H: Climatic Data, Wettest Year on Record <br />