Laserfiche WebLink
50 A- <br />O <br />C7 <br />00N <br />�xo�� \�J <br />82 + °° F 4kOp a,� <br />MOO <br />f, 9 <br />�c'A00 <br />00 \\ <br />k U1 <br />t0 <br />0 <br />0 <br />+ <br />co <br />LEO <br />pl, /, <br />Q <br />Fop +O° i <br />�k <br />I <br />/O <br />W T= <br />0 <br />N <br />W <br />O <br />O <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND El. FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />PREVIOUSLY DEPLOYED LINER <br />DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 19.215 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />APPROXIMATELY 2.616.404 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />O <br />+ WENT CRIPPLE CREEK & VICTOR <br />co GOLD MINING COMPANY <br />LtJ PROJECT <br />PHASE 5 VLF <br />TITLE <br />°o z PHASE 5 GEOMEMBRANE INSTALLATION <br />C) PSSA PRIMARY 100 MIL <br />W <br />O DESIGNED BY CWT CHECKED BY JDN DATE <br />O <br />+ �� DRAWN BY CMT APPROVED BY JDH 09 /11/1 <br />N <br />00 Z EARTH AND ENVIRONMENTAL. CARD FILENAME FIGURE No. REV <br />C) — 3b 0 <br />