Laserfiche WebLink
86 +00 x0 <br />2 +00 q +00 p0 <br />1p� �t <br />FBXo 0 <br />O F'10 +00 � <br />0 <br />00 <br />00X', iil ?ifll� ��j <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FLLT <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />PREVIOUSLY DEPLOYED LINER <br />^� DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 93,129 SQUARE FEET OF SECONDARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />APPROXIMATELY 2,616,404 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />o � <br />o <br />----w <br />X <br />c7 <br />_ <br />_ <br />T- <br />0 <br />"'Ed <br />c) <br />CUENT <br />CRIPPLE CREEK & VICTOR <br />- - <br />�+ <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />o X <br />qq <br />TITLE <br />�' <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />^00 <br />o <br />PSSA SECONDARY 100 MIL <br />p <br />_N <br />DESIGNED BY <br />CWT <br />I CHECKED BY <br />JOH I <br />DATE <br />O; <br />O <br />DRAWN BY <br />CMT <br />APPROVED BY <br />JOH <br />09/11/10 <br />CADD FILENAME <br />_ <br />FIGURE No. <br />3C <br />REV <br />0 <br />C7ry qq <br />EARTH AND ENVIRONMENTAL <br />