Laserfiche WebLink
O <br />f�i� <br />ON <br />k <br />t) <br />0 <br />oil <br />+ <br />00 +� 0 <br />• <br />O1 <br />N <br />0 <br />O\\ <br />k <br />0 <br />O <br />co <br />0 <br />r ��1 <br />r / <br />/O <br />O <br />/ Ld I! ' <br />O <br />O� <br />14 <br />N <br />W <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, ICU <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />PREVIOUSLY DEPLOYED LINER <br />�i DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 26,857 SQUARE FEET OF PRIMARY 80 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />APPROXIMATELY 2,616,404 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />all <br />O <br />W CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />+ PHASE 5 VLF <br />O z TITLE <br />+ PHASE 5 GEOMEMBRANE INSTALLATION <br />013 PSSA PRIMARY 80 MIL <br />0 <br />0 <br />+ DESIGNED BY CWT CHECKED BY JDH DATE <br />�� DRAWN BY CMT APPROVED BY JDH 09/11/1 <br />i l H AND ENVIRONMENTAL CARD RLEIIAME RGURE Ho. REV <br />- - - - - -- - 30 0 <br />