My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (30)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (30)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:42 PM
Creation date
2/27/2014 10:02:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 2 of 3 DOCUMENT 2 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />> Environmental <br />D) Overburden to Stockpile <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill areas and hauled to the <br />overburden stockpile area east of the east perimeter road near stations A28 +00 ( + / -) to A36 +00 <br />E) Cut to Fill <br />1) VLF <br />A CAT 385 excavator and a John Deere 850 excavator were used to excavate structural fill <br />material from the following areas: between stations A 18 +00 ( + / -) and A24 +00 ( + / -), <br />approximately 50 to 150 feet left of centerline; between stations H0 +00 ( + / -) and H9 +50 ( + / -), <br />approximately 50 feet left of centerline to 100 feet right of centerline; between stations; J14 +00 <br />( + / -) and J16 +00 ( + / -), approximately 20 to 60 feet right of centerline; and between stations <br />K11 +00 ( + / -) and K13 +00 ( + / -), approximately 120 to 200 feet right of centerline. The <br />structural fill material was loaded into CAT 777 haul trucks and hauled to fill areas. <br />Prior to structural fill placement existing fill areas were ripped and frost was allowed to thaw <br />or was removed. Existing fill temperature were monitored and found to be above 32 °F before <br />fill placement. An AMEC representative monitored ambient temperatures on an hourly basis <br />during fill placement. Fill temperatures were monitored during ambient temperatures below <br />32 °F and ranged between 33 °F to 39 °F. <br />Structural fill was placed in the following areas: between stations A54 +00 ( + / -) and A59 +00 <br />( + / -), approximately 70 feet left of centerline to 20 feet right of centerline; between stations <br />B8 +00 ( + / -) and B10 +00 ( + / -), approximately 50 feet left of centerline to 50 feet right of <br />centerline; between stations C1 +75 ( + / -) and C6 +00 ( + / -), approximately 20 to 80 feet left of <br />centerline; between stations 50 feet left of centerline to 70 feet right of centerline; and between <br />stations J3 +00 ( + / -) and J16 +00 ( + / -), approximately 0 to 150 feet right of centerline. <br />Structural fill was placed in 18" to 24" lifts using various CAT dozers. Each lift was moisture <br />conditioned using a CAT 773 water truck (when necessary) and compacted using a 10 -ton <br />vibratory smooth drum compactor, passing over the entire fill surface at least 4 times (method <br />compaction technique is applicable). Ambient and fill temperatures were monitored and <br />recorded during fill placement. <br />Blast pattern drilling was performed between stations 111 +50 ( + / -) and H9 +00 ( + / -), <br />approximately 90 feet left of centerline to 75 feet right of centerline. Blasting was performed <br />on Monday (3/22/2010), Tuesday (3/23/2010), Wednesday (3/24/2010), Thursday (3/25/2010), <br />and Friday (3/26/2010). No blasting was performed Saturday (3/27/2010). <br />F) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of Soil Liner Fill material continued this week. A CAT D -8 dozer, a CAT 320 <br />excavator, a CAT 966 front -end loader, and tandem -axel haul trucks were used to excavate, haul, <br />and process the material. The processing plant went down Tuesday (3/16/2010) due to mechanical <br />problems. <br />VLF Weekly Report WE 03.27.10.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.