ameO <br />Earth 8 [ <br />Location <br />Week <br />tons <br />Cumulative <br />Comments <br />E Cresson Clay Processing <br />4,872 <br />47,548 <br />Comments <br />S Cresson Clay Processing <br />0 <br />201,199 <br />Processing in area complete. <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area complete. <br />Total <br />4,872 <br />277,952 <br />2) Low Volume Solution Collection Fill Material ( LVSCF) <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D -10 dozer and a skid steer loader were used to process the material. <br />G) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />No work was performed during the week. <br />B) Mine Shaft /Stope Remediation <br />Remediation of Underground Working #3012 continued with the placement of the concrete plug. <br />Approximately 100 cubic yards of 4000 -psi concrete was placed in the previously prepared <br />opening. The area inspected by an AMEC representative prior to concrete placement and found to <br />be constructed properly in competent and frost/ice free material. Two samples were obtained <br />randomly during concrete placement. Slump testing, air - entrainment testing, temperature testing, <br />and casting of five 6" x 12" cylinders was performed for each sample. All field properties testing <br />results were with in project specifications and performed in accordance with ASTM /ACI <br />standards. The cylinders cast will be transported to an off -site facility and tested for compressive <br />strength at specified curing ages. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. <br />Storm water controls are being constructed in the East Cresson Clay Borrow as needed. <br />VLF Weekly Report WE 03.27.10.D. c- <br />Week <br />Location <br />Comments <br />tons <br />(tons) <br />Dump 4 LVSCF Processing <br />16,407 <br />226,475 <br />G) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />No work was performed during the week. <br />B) Mine Shaft /Stope Remediation <br />Remediation of Underground Working #3012 continued with the placement of the concrete plug. <br />Approximately 100 cubic yards of 4000 -psi concrete was placed in the previously prepared <br />opening. The area inspected by an AMEC representative prior to concrete placement and found to <br />be constructed properly in competent and frost/ice free material. Two samples were obtained <br />randomly during concrete placement. Slump testing, air - entrainment testing, temperature testing, <br />and casting of five 6" x 12" cylinders was performed for each sample. All field properties testing <br />results were with in project specifications and performed in accordance with ASTM /ACI <br />standards. The cylinders cast will be transported to an off -site facility and tested for compressive <br />strength at specified curing ages. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. <br />Storm water controls are being constructed in the East Cresson Clay Borrow as needed. <br />VLF Weekly Report WE 03.27.10.D. c- <br />