My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-26_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2014-02-26_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:17 PM
Creation date
2/27/2014 8:48:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
2/26/2014
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
2/24/2014
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 24, 2014 C- 1996 -083 /13owie No. 2 Mine SLB <br />Gob Piles #1 and #4 <br />• The piles were mostly clear of snow and appeared to be stable. <br />• There were no signs of any recent activity on either pile. <br />• Cover material stockpiled on the upper bench of Gob Pile 44 was stable and clear of the surface water <br />diversion and collection ditches. <br />Gob Pile 43 <br />• The pile was active at the time of the flight. <br />• An excavator was loading cover material from the stockpile to a haul truck; it appeared that the material <br />was being used for mixing into Gob Pile 43 waste for compaction. <br />• Recently placed material did not appear to have been placed in a controlled manner, and there were <br />several areas on the east/northeast end of the pile where water appeared to be impounded and was not <br />immediately directed off of the pile. The impounded water was also mentioned in the self -report <br />provided by BRL based on a consultant inspection of the site on February 17, 2014. <br />- Trenches need to be cut into the area immediately, to allow the material to drain. <br />- End dumped material not stored in the approved temporary drying areas must be placed in a controlled <br />manner and concurrently compacted. <br />• An excavator, compactor and dozer were working on the central portion of the pile. <br />ENFORCEMENT ACTIONS /COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />Number of Partial Inspection this Fiscal Year: 12 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.