Laserfiche WebLink
Februaiv 24, 2014 C- 1996- 083 /Bov ie No. 2 Mine SLB <br />PHOTOGRAPHS <br />"1"44-0 -. <br />'tip ti , - •• -r <br />D Portal Bench <br />Gob Pile 42 <br />ttia. <br />Number of Partial Inspection this Fiscal Year: 12 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 4 of 6 <br />Coal <br />stockpile <br />height is <br />approaching <br />limits of <br />topsoil <br />stripping <br />Temporary <br />gob drying <br />area <br />Pond F <br />