Laserfiche WebLink
ameO <br />3. Provide continuous northing, easting, and elevation reference for field testing and <br />sampling location identification. <br />4. Provide depth verification for the Low Volume Solution Collection Fill on a 50 -foot by <br />50 -foot grid with additional points at all grade breaks. <br />5. Provide depth verification for Drain Cover Fill on a 50 -foot by 50 -foot grid with <br />additional survey points at all breaks in grade. <br />6. Provide northing, easting and elevation reference for any underground working <br />confirmatory drillhole and blasthole locations. <br />Northings, eastings, and elevations for Items 1, 2, 3 and 6 will be performed on a daily basis and <br />results will be provided to the MANAGER in both electronic and hardcopy format within 24 hours of <br />performing the survey. <br />* ** END OF SECTION * ** <br />Section 01050 Page 3 of 3 September 3, 2008 <br />Construction Staking Revision 1 <br />SAProjects \1125 CC&V Phase 5 VLF\I - Tech Specs\Arequa IFC Specs \01050.r1.doc <br />