My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:31:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 3 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />SECTION 01400.1 EARTHWORKS CONSTRUCTION QUALITY ASSURANCE (COA) PLAN <br />PART 1: INTRODUCTION <br />This plan addresses the construction quality assurance (CQA) procedures for the installation of the earthworks <br />(soils) components of the valley leach facility at the Cresson Project, Teller County, Colorado. This program <br />has been developed to assure that the construction of the soil components are in compliance with the project <br />SPECIFICATIONS and to demonstrate that the regulatory requirements for the construction are achieved. <br />The objective of this plan is to assure that proper materials, construction techniques, and procedures are <br />followed by the CONTRACTOR and that the intent of the design is met. This plan also provides the means <br />for resolution of problems that may occur during construction. <br />This plan addresses quality assurance, not quality control. This CQA Plan is independent of the quality control <br />(QC) programs conducted by CONTRACTOR. The intent of the CQA Plan is to provide independent third <br />party verification and testing, to demonstrate that the CONTRACTOR has met its obligations in the supply <br />and installation of earthwork (soils) materials according to the design, project SPECIFICATIONS, contractual, <br />and regulatory requirements. Quality control is provided by CONTRACTOR and refers to those actions <br />taken by the CONTRACTOR to ensure that materials and workmanship meet the requirements of the <br />DRAWINGS and SPECIFICATIONS. <br />PART 2: DESCRIPTION OF PARTIES TO CONSTRUCTION OUALITY ASSURANCE <br />The following section provides descriptions of the parties to this CQA Plan including their responsibilities and <br />qualifications. <br />2.01 CC &V: <br />In this CQA Plan, CC &V refers specifically to Cripple Creek & Victor Gold Mining Company. CC &V owns <br />and operates the valley leach facility. <br />2.02 MANAGER: <br />In this CQA Plan, MANAGER refers to the individual appointed by the Cripple Creek & Victor Gold Mining <br />Company. MANAGER is the official representative of CC &V and is responsible for all construction <br />activities including oversight and direction during construction. MANAGER is also responsible for <br />coordinating construction and CQA activities for the project. <br />MANAGER shall serve as communications coordinator for the project, initiating preconstruction and <br />resolution meetings. As communications coordinator, MANAGER will serve as a liaison between all parties <br />involved in the project to ensure that ongoing communications are maintained. MANAGER and <br />CERTIFYING ENGINEER shall be responsible for the resolution of all CQA issues. <br />Duties for this position include the following: <br />■ review and approval of DRAWINGS and SPECIFICATIONS for all soil components of the <br />valley leach facility; <br />■ preconstruction coordination with the CQA Monitor to ensure that the CQA Monitor has <br />performed similar reviews of the DRAWINGS and SPECIFICATIONS to ensure that the <br />CQA Plan can be implemented; <br />Section 01400.1 Page 1 of 9 September 3, 2008 <br />Earthworks COA Plan Revision 1 <br />SAProjects \1125E CCV CQA \I -Tech Specs \01400.1.rt.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.