My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:31:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 3 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />leach facility topographic features (i.e., toe of slope, crest of slope, breaks in grade), unless otherwise <br />directed by MANAGER. The Record Drawings shall include elevations and locations for the <br />following: <br />• Underdrain plan view showing the limits of the valley leach facility. Underdrain Fill <br />and underdrain alignment, with elevations every approximately 100 feet or on every <br />break in grade <br />• Diversion channel plan and profile view along the diversion channel alignment <br />• Leak detection trench plan view showing the limits of the valley leach facility, leak <br />detection trench alignment, and leak detection sumps, with elevations every <br />approximately 100 -feet <br />• Soil Liner Fill plan view showing the limits of the valley leach facility, with contours <br />of the Soil Liner Fill and Bedding Fill surface on a 10 -foot contour interval, <br />including the regraded ore slopes and end berms <br />• Low Volume Solution Collection piping plan showing the limits of the composite <br />liner, double liner and single liner, and piping alignment with elevations every <br />approximately 100 feet <br />• Perimeter access roads <br />• Top of Upper geosynthetics in the Pregnant Solution Storage Area, including the <br />Vertical Riser Sump and base plates <br />• High Volume Solution Collection piping plan showing the limits of the VLF, and <br />piping alignment with elevation every approximately 100 -feet <br />In addition, the Colorado licensed surveyor will provide a surveyor's certificate to be submitted in the <br />Construction Certification Report. <br />C. Submittal: <br />CONTRACTOR will submit completed as -built documentation within seven (7) calendar days upon <br />completion of the work in the following manner: <br />1. Submit two (2) reproducible copies (mylar) to the MANAGER. <br />2. Submit two (2) non - reproducible copies to the MANAGER in electronic form on <br />compact disks (CD) or DVD's and in an AutoCAD compatible format. <br />D. The CONTRACTOR will be responsible for performing the following survey activities associated <br />with the Construction Certification Report: <br />1. Provide northing, easting, and elevation for all Soil Liner Fill depth verifications. <br />2. Provide northing, easting, and elevation for geomembrane panel intersections and <br />destructive samples. <br />Section 01050 Page 2 of 3 September 3, 2008 <br />Construction Staking Revision 1 <br />SAProjects \1125 CC &V Phase 5 VLF\I -Tech Specs\Arequa IFC Specs \01050.r1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.