ameO <br />Earth 8 Environmental <br />D) Slope Contouring <br />1) VLF <br />Slope contouring was performed between stations E8 +00 ( + / -) and E10 +00 ( + / -), <br />approximately, 100 to 150 feet right of centerline and between station E16 +00 ( + / -) and <br />E20 +00 ( + / -), approximately 100 to 150 feet right of centerline. Slope contouring was <br />performed using a CAT D -9 dozer. Material generated as the cut progressed was pushed down <br />the slope. <br />E) Overburden to Stockpile <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill areas and hauled to the <br />overburden stockpile area east of the east perimeter road near stations A28 +00 ( + / -) to A36 +00 <br />F) Cut to Fill <br />1) VLF <br />A CAT 385 excavator and a John Deere 850 excavator were used to excavate structural fill <br />material from the following areas: between stations E 15 +00 ( + / -) and E 18 +00 ( + / -), <br />approximately 20 feet left of centerline to 100 feet right of centerline; between stations F 1 +50 <br />( + / -) and F7 +00 ( + / -), approximately 100 to 150 feet right of centerline; between stations <br />G5 +00 ( + / -) and G7 +00 ( + / -), approximately 250 to 300 feet right of centerline; and between <br />stations H11 +00 ( + / -) and H13 +00 ( + / -), approximately 0 to 50 feet right of centerline. The <br />structural fill material was loaded into CAT 777 haul trucks. <br />Prior to structural fill placement existing fill areas were ripped and frost was allowed to thaw <br />or was removed. Existing fill temperature were monitored and found to be above 32 °F before <br />fill placement. An AMEC representative monitored ambient temperatures on an hourly basis <br />during fill placement. Fill temperatures were monitored during ambient temperatures below <br />32 °F and averaged 33 °F to 44T. On average, fill preparations were performed for one to one <br />and a half hours before fill temperatures were within project specification. <br />Structural fill was placed in the following areas: between stations B 1 +75 ( + / -) and B7 +00 ( + / -), <br />approximately 100 feet left of centerline to 100 feet right of centerline; between stations C0 +00 <br />( + / -) and C4 +00 ( + / -) approximately 50 left of centerline to 50 right of centerline; between <br />stations D2 +00 ( + / -) and D4 +75 ( + / -), approximately 50 feet left of centerline to 50 feet right <br />of centerline; and between stations F0 +50 ( + / -) and F7 +00 ( + / -), approximately 100 feet left of <br />centerline to 100 feet right of centerline. Structural fill was placed in 18" to 24" lifts using <br />various CAT dozers. Each lift was moisture conditioned using a CAT 773 water truck (when <br />necessary) and compacted using a 10 -ton vibratory smooth drum compactor, passing over the <br />entire fill surface at least 4 times (method compaction technique is applicable). Ambient and <br />fill temperatures were monitored and recorded during fill placement. <br />Blast pattern drilling was performed between stations E8 +00 ( + / -) and E11 +00 ( + / -), <br />approximately 50 to 100 feet right of centerline and between station F2 +00 ( + / -) and F4 +00 <br />( + / -), approximately 50 to 100 feet right of centerline using three track mounted drill rigs. <br />VLF Weekly Report WE 01.09.10.D.doc <br />