ameclO <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: January 9, 2010 <br />Reporting Period: 1/3/10 through 1/9/10 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />- <br />D = DaN Shift N = Night Shift <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day <br />Ambient Temperature Range (F): Low: -4 °F to 18 °F ( + / -) High: 23 °F to 40 °F ( + / -) <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: Ames resumed work activities Monday January 4, 2010 after observing the Christmas and New <br />Year's holidays. <br />Ames did not haul fill material Monday January 4, 2010, due to frost removal and fill <br />preparations needed from the previous two weeks of inactivity. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Clearing and Grubbing <br />1) VLF <br />A small amount of clearing and grubbing was performed to allow for haul road construction at <br />the East Cresson Clay Borrow. <br />B) Stripping <br />1) VLF <br />No work performed during the week. <br />C) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />VLF Weekly Report WE 01.09.10.D.doc <br />