My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:01:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 2 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />Earth & Environmental <br />and H8 +00 ( + / -), approximately 50 to 100 feet right of centerline; between stations J5 +00 ( + / -) <br />and J14+00 ( + / -), approximately 100 feet left of centerline to 25 feet right of centerline; and <br />between stations J28 +00 ( + / -) and J30 +00 ( + / -), approximately 100 to 150 feet right of <br />centerline. Slope contouring was performed using various CAT dozers. Material generated as <br />the cut progressed was pushed down the slope. <br />D) Overburden to Stockpile <br />1) VLF <br />Oversize rock within the Phase 5 VLF fill area was removed from fill areas and hauled to the <br />overburden stockpile area east of the east perimeter road near stations A28 +00 ( + / -) to A36 +00 <br />E) Cut to Fill <br />1) VLF <br />A CAT 385 excavator, a CAT 375 excavator, and a John Deere 850 excavator were used to <br />excavate structural fill material from the following areas: between stations A20 +00 ( + / -) and <br />A23 +00 ( + / -), approximately 10 to 100 feet left of centerline; between stations H2 +00 ( + / -) <br />and H7 +00 ( + / -), approximately 50 feet left of centerline to 100 feet right of centerline; <br />between stations; and between stations J28 +00 ( + / -) and J30 +00 ( + / -), approximately 75 to 100 <br />feet right of centerline. The structural fill material was loaded into CAT 777 haul trucks and <br />hauled to fill areas. <br />Prior to structural fill placement existing fill areas were ripped and frost was allowed to thaw <br />or was removed. Existing fill temperature were monitored and found to be above 327 before <br />fill placement. An AMEC representative monitored ambient temperatures on an hourly basis <br />during fill placement. Fill temperatures were monitored during ambient temperatures below <br />32 °F and averaged 33 °F to 39 °F. <br />Structural fill was placed in the between stations J3 +00 ( + / -) and J 10 +00 ( + / -), approximately 0 <br />to 150 feet right of centerline. Structural fill was placed in 18" to 24" lifts using various CAT <br />dozers. Each lift was moisture conditioned using a CAT 773 water truck (when necessary) and <br />compacted using a 10 -ton vibratory smooth drum compactor, passing over the entire fill <br />surface at least 4 times (method compaction technique is applicable). Ambient and fill <br />temperatures were monitored and recorded during fill placement. <br />Blast pattern drilling was performed between stations A17 +00 ( + / -) and A20 +00 ( + / -), <br />approximately 10 to 50 feet left of centerline and between stations H2 +00 ( + / -) and H3 +00 <br />( + / -), approximately 80 to 100 feet right of centerline. Blasting was performed on Monday <br />(3/8/2010), Tuesday (3/9/2010), and Wednesday (3/10/2010). No blasting was performed <br />Thursday (3/11/2010), Friday (3/12/2010), and Saturday (3/13/2010). <br />F) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of Soil Liner Fill material continued this week. A CAT D -8 dozer, a CAT 320 <br />excavator, a CAT 966 front -end loader, and tandem -axel haul trucks were used to excavate, haul, <br />and process the material. <br />VLF Weekly Report WE 03.13.10.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.