amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: March 13, 2010 <br />Reporting Period: 3/7/10 through 3113110 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />- <br />- <br />N <br />N <br />N <br />N <br />- <br />- <br />D = Day Shift N _ Night Shift <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Ambient Temperature Range (F): Low: 15 °F to 29 °F ( + / -) High: 32 °F to 43 °F <br />AMEC CQA: Personnel On -site through the Reporting Period (See Attachment A). <br />AMES: Due to snowfall and slick haul routes through out the week, night shift operations were canceled. <br />On average, fill operations did not begin until 10:30am on dayshift due to snow removal and fill <br />preparations. <br />No work activities were performed Friday (3/12/2010) and Saturday (3/13/2010) due to Ames' Annual <br />Managers Meeting. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Stripping <br />1) VLF <br />Topsoil stripping was performed during clay excavation using one CAT D -6 dozer and one <br />CAT 330 excavator at the East Cresson Clay Borrow. Haulage of topsoil to the East Cresson <br />Clay Borrow topsoil stockpile continued using tandem -axel haul trucks. <br />B) Subgrade Preparation <br />1) VLF <br />No work performed during the week. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations A14 +00 ( + / -) and <br />A20 +00 ( + / -), approximately 10 to 150 feet left of centerline; between stations H4 +00 ( + / -) <br />VLF Weekly Report WE 03.13.10.D.doc <br />