2011-11-19_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:01:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 2 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec- <br />L—th & Envuoi, m_ <br />Location <br />Week <br />tons <br />Cumulative <br />Comments <br />E Cresson Clay Processing <br />5,173 <br />40,389 <br />S Cresson Clay Processing <br />0 <br />201,199 <br />Processing in area complete. <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area complete. <br />Total <br />5,173 <br />270,793 <br />2) Low Volume Solution Collection Fill Material ( LVSCF) <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D -10 dozer and a skid steer loader were used to process the material. <br />Location <br />Week <br />Culm)lative <br />Comments <br />(tons) <br />to <br />Dump 4 LVSCF Processing <br />17,523 <br />194,826 <br />G) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />Confirmatory drilling was performed for Underground Working #3012. A drill pattern was set out <br />by an AMEC field representative. Twenty -five holes were drilled encountering ten voids. An <br />approximate total of 1250 feet was drilled. An AMEC representative observed the confirmatory <br />drilling constantly. <br />B) Mine Shaft /Stope Remediation <br />Grouting of miss (no void) holes was performed at Underground Workings #3012. <br />Collapsing of the crown pillar at Underground Working #3012 was performed by blasting <br />confirmatory drill holes (voids). Blasting was performed Wednesday (3/10/2010). The area was <br />inspected by an AMEC representative and approximately 8 feet of elevation difference was <br />noticed. A CAT 345 excavator was used to remove temporary fill material and native material <br />from the working, discovering the limits of the working. Excavation of the working will continue <br />next week. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. <br />VLF Weekly Report WE 03.13.10.D.doc <br />