Laserfiche WebLink
amec <br />F 3 Environmental <br />Summary of SLF Drocessine <br />Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />Dump 5 Clay Plant <br />11,800 <br />14,300 <br />Thru 23` obtained from Ames <br />Totals <br />Feet <br />Drilled <br />G. Miscellaneous <br />1. No Activities <br />II. Underground Working <br />A. Drilling <br />• RockBreakers continued drilling within the sediment collection pond area. Drilling was <br />intermittent at the beginning of the week but improved by the end of the week. By the <br />end of the week, the drillers were able to improve production. <br />Drillino, Summary <br />B. Mine Shaft /Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• No Activities <br />III. Stormwater Management Structures <br />A. Control Structures <br />• No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane <br />• No Activities <br />Sheet 3 of 8 <br />VLF Weekly Report WE 02.21.09 <br />Current Week <br />Cumulative <br />Location <br />Comments <br />Holes <br />Feet <br />Holes <br />Feet <br />Drilled <br />Drilled <br />(ea) <br />(e2% <br />Sediment <br />5750 <br />10,450 <br />Thru 23rd footage obtained from Ames <br />Collection Pond <br />Totals <br />B. Mine Shaft /Stope Remediation <br />• No Activities <br />C. Lateral/Slot Remediation <br />• No Activities <br />III. Stormwater Management Structures <br />A. Control Structures <br />• No Activities <br />IV. VLF Geosynthetics <br />A. LLDPE Geomembrane <br />• No Activities <br />Sheet 3 of 8 <br />VLF Weekly Report WE 02.21.09 <br />