My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 2:28:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />��irth & Er w...mo r it�il <br />Sheet 2 of 8 <br />• No Activities. <br />2. Sediment Collection Pond <br />• No Activities <br />C. Waste Rock to Stockpile <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />D. Cut to Fill <br />1. VLF <br />• Ames started placement of structural fill on Friday 20 along the existing haul <br />road between the 5 -point intersection and the crusher maintenance area. The fill <br />placement was to grade the road for drainage away from the sediment retention <br />basin located to the South and direct any run -off toward the retention basin <br />South of the crusher, North of the existing haul road. <br />• Amec discussed with Ames that the adjacent areas along the fill will require <br />over excavation of uncontrolled materials, frozen ground and sediment within <br />any retention drainages and completion of key -ins when the fill is extended to <br />adjacent areas. <br />• Structural fill placement along the existing haul road section is anticipated to <br />continue next week. <br />2. Sediment Collection Pond <br />• No Activities <br />E. Subgrade Preparation <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />F. SLF Processing (Material is being generated /processed for the LOB and the VLF) <br />• Production of the SLF material continued intermittently at the Dump 5 clay <br />processing plant during the week. Continued maintenance problems resulted in <br />reduced production for the week. <br />• Ames continued setup of a second screening plant in the VLF to process other <br />construction materials. The second plant is identified as the VLF Materials <br />Processing Plant. Setup was not completed by the end of the week. This plant <br />will not be used to process SLF. <br />VLF Weekly Report WE 02.21.09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.