2011-11-19_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 2:28:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame�O <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Project No.: 8420125EO <br />Contractor: Ames Construction Co., Inc. <br />Date: 2/24/09 Reporting Period: 02/15/09 through 02/21/09 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />s <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />N <br />N <br />N <br />N <br />+N- <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 15° High: 33° <br />AMEC CQA Personnel On -site through the Reporting Period (See Attachment A). <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I. EARTHWORKS <br />A. Clear and Grubbing <br />Sheet 1 of 8 <br />1. VLF <br />• Ames worked intermittently during the week to continue clearing and grubbing <br />activities along the East Perimeter Access Road. Work extended South to <br />Station 15 +80 ( + / -) left and right of centerline. Pioneer roads were continued to <br />the South for access. Ames used one to two excavators to consolidate grubbed <br />material for loading. <br />• Ames started removal of trees at the end of the week. Topsoil work at the <br />substation was temporarily stopped at Ames used the Volvo A40D trucks to <br />transport the material to a slash pile located North of Ames maintenance <br />facility. <br />2. Sediment Collection Pond <br />• No Activities. <br />B. Stripping <br />1. VLF <br />• Ames continued to relocate the existing topsoil located near the northwest edge <br />of the Phase 5 VLF. This area is identified by the Contractor as the "substation" <br />area. The topsoil was being hauled to the lower stockpile north of the five point <br />intersection. Work was stopped at the end of the week to use the trucks for <br />hauling of trees from the clearing and grubbing in the northeast area of the VLF <br />along the East perimeter road from Station 15 +80 to 22 +00. <br />VLF Weekly Report WE 02.21.09 <br />