My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 2:28:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'-'9 <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. Field observation included removal of the existing topsoil stockpile near the <br />northwest portion of the VLF. In addition, observation of the drilling began on February 5, 2009 to <br />delineate the extent of underground mine workings located beneath the sediment collection pond and <br />continued through week ending 2/13. <br />Night shift continued from February 16 to February 20 with relocation of topsoil from the substation area. <br />Clay processing was intermittent due to mechanical problems with the clay plant. The second clay plant <br />(Dump 5 Clay Process Plant) being setup in the VLF was still not operational by the end of the week. <br />No work was performed on Saturday, February 21. Currently no work activities are planned for Saturdays <br />but Ames has indicated that Saturday will be used as a make up day in the event of delay or stoppage <br />during the current planned work periods Monday to Friday. Amec had one staff on site Saturday, February <br />21 for half a day to start processing of samples collected during the week. <br />I. Testing Summary <br />Amec began processing of clay and structural fill samples collected during the week. <br />One sample was collected for the structural fill being placed along the existing haul road between the 5- <br />point intersection and the crusher area. The fill is being placed only within the limit of the haul road at <br />this time to adjust road grading for run -off management. Amec has discussed with Ames that adjacent <br />areas will require removal of uncontrolled materials, frozen ground and excavation of sediment retention <br />areas. These ityems were discussed with Ames and CC &V and agreed. <br />Sample Summary <br />Description <br />Comments <br />SF -1 -R <br />Structural fill, VLF <br />SLF -5 -C <br />Unprocessed clay, in- progress <br />SLF -4 -C <br />Unprocessed clay, in- progress <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No Concerns <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V.• <br />Sheet 4 of 8 <br />VLF Weekly Report WE 02.21.09 <br />