Laserfiche WebLink
October 2001 -15- 003-2182.004 <br /> Golder performed two CQA gradations of Soil Liner Fill. The testing frequency(approximately <br /> one test per 3000 cubic yards)exceeded the minimum specified testing frequency of one test per <br /> 5,000 cubic yards. The CQA gradations performed of Soil Liner Fill met project specifications. <br /> The Soil Liner Fill CQA gradation results are presented in Appendix G-1 and summarized in <br /> Table 5. <br /> Golder performed one CQA gradation of Leak Detection Fill. LDA-1 failed to meet project <br /> specifications and the material was rejected for use in the External Pond. The testing frequency <br /> (approximately one test per 25 cubic yards) exceeded the minimum specified testing frequency <br /> of one test per 10,000 cubic yards. The CQA gradation of Leak Detection Fill for LDA-2 met <br /> project specifications. The Leak Detection Fill CQA gradation results are presented in <br /> Appendix G-1 and summarized in Table 6. <br /> Golder performed one CQA gradation of Pipe Bedding Fill. The testing frequency <br /> (approximately one test per 20 cubic yards) exceeded the minimum specified testing frequency <br /> of one test per 10,000 cubic yards. The CQA gradation of Pipe Bedding Fill met project <br /> specifications. The Pipe Bedding Fill CQA gradation results are presented in Appendix G-1 <br /> and summarized in Table 7. <br /> Golder performed one CQA gradation on Base Course. The Base Course CQA gradation <br /> results are presented in Appendix G-1 and summarized in Table 8. <br /> 4.1.2 Moisture Content <br /> Golder measured oven moisture contents of Structural Fill, Soil Liner Fill, Leak Detection <br /> Fill, Pipe Bedding Fill, and Base Course as part of grain size distribution analyses. Golder <br /> also measured oven moisture contents of Structural Fill and Soil Liner Fill as part of field <br /> density tests. <br /> IW0\2182\EXTERNAL POND RPWINALDOC Golder Associates <br />